My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2021-09 Resolution Authorizing a Professional Engineering Services Agreement with Clark Dietz Inc. to Provide Final Design Services for the Brush College and Reas Bridge Lift Station and Forcemain City Project 2020-06
COD
>
City Clerk
>
RESOLUTIONS
>
2021
>
R2021-09 Resolution Authorizing a Professional Engineering Services Agreement with Clark Dietz Inc. to Provide Final Design Services for the Brush College and Reas Bridge Lift Station and Forcemain City Project 2020-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2021 3:59:15 PM
Creation date
2/2/2021 3:59:11 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2021-09
Res Ord Title
R2021-09 Resolution Authorizing a Professional Engineering Services Agreement with Clark Dietz Inc. to Provide Final Design Services for the Brush College and Reas Bridge Lift Station and Forcemain City Project 2020-06
Department
Public Works
Approved Date
2/1/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BRUSH COLLEGE ROAD SEWER STUDY City of Decatur <br /> EXECUTIVE SUMMARY <br /> The City of Decatur has been approached about developments in the Brush College/Reas Bridge Road vicinity. <br /> To support such developments,the City needs to provide sanitary sewer services to this area.The City retained <br /> Clark Dietz to prepare a Sewer Study for this area to determine: <br /> • Service area <br /> • Improvement phasing and flow rates <br /> • Treatment and tie-in location <br /> • Preliminary design criteria for the new infrastructure requirements <br /> • Costs <br /> • Recommendations <br /> Service Area <br /> The 550-acre target Service Area surrounding the Reas Bridge Road and Brush College Road intersection was <br /> outlined based on existing industry limits,site topography,and input from City staff.The general area that <br /> would be served by the new sewer is shown in Figure 1. <br /> L&A Industnai Drive <br /> r � I <br /> s, <br /> Undeveloped Asea <br /> Existing Residential57 flares"" 179 Acres <br /> i <br /> `Existing Industrial <br /> Undevei <br /> 22A(- Admm @wilding <br /> oped Area <" <br /> „�: 209 Acres <br /> Development t <br /> 29 Acres' Undeveoped Area <br /> 91 Acres <br /> Development 2 1 <br /> 24 <br /> . .rt Legend <br /> +., Addi'l Pump Station <br /> PUnned <br /> Future <br /> FM Forcemam <br /> SS Sanitary Sewer <br /> 4.' <br /> Mueller Ave k' . sTr' SW Storm Sewer <br /> Figure 1.Identified Service Area for Sanitary Sewer <br /> This Service Area encompasses the planned developments provided to Clark Dietz by the City(Development 1 <br /> and Development 2), undeveloped areas,and existing developed but unsewered areas.The areas shown in <br /> figure two labeled as either"planned"or"future"would be served by gravity sewers.The areas labeled as <br /> "Addt'I Pump Station"on the east side of the figure are location in low-lying areas and require an additional <br /> pump station to pump flow to the proposed new pump station. <br /> Improvement Phasing and Flow Rates <br /> The design sewer flow rates from the Service Area were calculated based on land area and anticipated (or <br /> existing)land use.To control costs and avoid oversizing planned infrastructure,sewering of the Service Area <br /> was divided into three phases.These phases were defined as: <br /> Clark Dietz,Inc. 3 January 2021 <br />
The URL can be used to link to this page
Your browser does not support the video tag.