BRUSH COLLEGE ROAD SEWER STUDY City of Decatur <br /> • Phase I -flow from the existing two planned developments plus 25%of the existing undeveloped <br /> area. <br /> • Phase II -flow from the two planned developments plus 33%of the existing undeveloped area and <br /> providing sewer service to all the existing industrial and residential properties that do not currently <br /> have sewer service. <br /> • Phase III -the same as Phase II with all the identified Service Area developed. <br /> The acreages and estimated peak sewage design flow rates from these areas are summarized in Table 1. <br /> Table 1.Phased Design Flow Summary <br /> Addt'l Water Approx. <br /> Development Planned Service Existing Existing Plant Area Peak Design <br /> Phase Develop. Area Industrial Residential Admin (Acres) Flow(gpm) <br /> Phase 100% 25% - - - 118 680 <br /> Phase 11 100% 33% 100% 100% 100% 308 1,325 <br /> Phase 111 100% 100% 100% 100% 100% 550 2,830 <br /> Treatment and Tie-in Location <br /> Sanitary and industrial wastewater collected by the proposed new sewers will be directed to the City's existing <br /> collection system for conveyance to and treatment in the Sanitary District of Decatur's(SDD)existing <br /> wastewater treatment plant(WWTP). Based on discussions with the SDD,the WWTP has sufficient capacity to <br /> treat the expected flow rates. <br /> The capacity of the four existing sanitary sewers closest to the Service Area were reviewed to determine their <br /> feasibility as tie-in locations.Connecting to the Faries Park Pump Station was also assessed.The feasible and <br /> cost-effective sanitary sewer tie-in location is the 27th Street sewer at the intersection of Hubbard Avenue.This <br /> gravity sewer flows to the SDD's Damon Avenue Pump Station.The calculated available capacity in this sewer <br /> is approximately 1,325 gpm,which was the basis of the Phase II flow rate selection.Flows greater than 1,325 <br /> gpm exceed the 271h Street sewer capacity and will require either increasing the 27th Street gravity sewer size <br /> or pumping from the new Service Area all the way to the Damon Avenue Pump Station. <br /> The SDD feels that the Damon Avenue Pump Station has the capacity to accommodate the flows from the <br /> proposed Service Area. However,they are concerned about the capacity of the sewer system downstream of <br /> the Damon Avenue Pump Station.SDD has stated that this downstream sewer should be able to <br /> accommodate the Phase I flow from the Service Area but flows greater than this may require a capacity study <br /> of the downstream sewers. <br /> Infrastructure (Requirements <br /> The Service Area will require gravity sewers to collect sanitary and industrial wastewater. Due to the topography <br /> of the Service Area in relation to the City's existing gravity sewers,collected wastewater needs to be pumped to <br /> the existing collection system.Therefore,there will be three components to the new infrastructure:gravity <br /> sewers,a pump station,and a forcemain.The length and size of the various components depends both on the <br /> flows and discharge location(discussed above)and also on the Pump Station Location. <br /> Pump Station Location.Three potential pump station locations were evaluated for site constraints,forcemain <br /> length,gravity sewer requirements,and construction cost.The location at the intersection of Brush College <br /> Road and Reas Bridge Road (Figure 2)was determined to be the most feasible option because of its low initial <br /> cost and central location.The gravity sewer depth is minimized due to the central location and sewer is easily <br /> installed in the future along the surrounding main roads. <br /> Clark Dietz,Inc. 4 January 2021 <br />