Laserfiche WebLink
BRUSH COLLEGE ROAD SEWER STUDY I City of Decatur <br /> Phase III recommendations include: <br /> • Add a second wetwell sized for Phase III flows including an additional valve vault,electrical <br /> controls,and generator. <br /> • Upgrade the pumps with larger pumps to service the additional flow. <br /> • Install a parallel 8" Forcemain along Hubbard Road to 27th Street. <br /> • Install an additional pump station at the east side of the Service area and a forcemain to the east <br /> end of the new gravity sewer installed in Phase II. <br /> Clark Dietz,Inc. 7 January 2021 <br />