My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2021-09 Resolution Authorizing a Professional Engineering Services Agreement with Clark Dietz Inc. to Provide Final Design Services for the Brush College and Reas Bridge Lift Station and Forcemain City Project 2020-06
COD
>
City Clerk
>
RESOLUTIONS
>
2021
>
R2021-09 Resolution Authorizing a Professional Engineering Services Agreement with Clark Dietz Inc. to Provide Final Design Services for the Brush College and Reas Bridge Lift Station and Forcemain City Project 2020-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2021 3:59:15 PM
Creation date
2/2/2021 3:59:11 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2021-09
Res Ord Title
R2021-09 Resolution Authorizing a Professional Engineering Services Agreement with Clark Dietz Inc. to Provide Final Design Services for the Brush College and Reas Bridge Lift Station and Forcemain City Project 2020-06
Department
Public Works
Approved Date
2/1/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
L&A Industnal Dnve ' <br /> Undeveloped Area <br /> 1 57 Acres Existing Residential <br /> w <br /> h ; o 179 Acres <br /> e Reas ridge Road <br /> 3 Acres <br /> Existing Industrial �... <br /> 22 Acres Admin Buildin <br /> UndevelopedArea <br /> g <br /> 209 Acres <br /> Y <br /> Development 1 <br /> 29 Acres <br /> Undeveoped Area <br /> 91 Acres <br /> Development 2 x <br /> Y� 2A Acres <br /> 7 � 3 <br /> r <br /> u.,p, a .I ,; Legend <br /> Addt'I Pump Station <br /> s Planned <br /> Future <br /> s <br /> FM Forcemain <br /> S5 Sanitary Sewer <br /> MMueller Ave4w , �r�. SW Storm Sewer <br /> Figure 1 —Brush College Reas Bridge Service area <br /> Sanitary sewer flow can vary for commercial and industrial areas due to the type and use of the <br /> property,the actual area serviced will require to be adjusted by how the area is developed. <br /> The professional service agreement will provide design engineering services that includes the <br /> infrastructure required to serve the proposed development on the Southeast corner of Brush College <br /> and Reas Bridge. The proposed project layout is provided in Figure 2, the actual final locations will <br /> vary depending on property and easement negotiations. The only gravity sewer included in this <br /> project is future gravity 1 as required to serve the proposed development. <br /> The budget estimate for construction and construction engineering is $2.9 million. <br /> — 2 ^- <br />
The URL can be used to link to this page
Your browser does not support the video tag.