My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2021-12 Resolution Authorizing a Local Public Agency Agreement for Federal Participation with the State of Illinois to Improve the Center Street Bridge over Stevens Creek SN: 058-3061 City Project 2019-04
COD
>
City Clerk
>
RESOLUTIONS
>
2021
>
R2021-12 Resolution Authorizing a Local Public Agency Agreement for Federal Participation with the State of Illinois to Improve the Center Street Bridge over Stevens Creek SN: 058-3061 City Project 2019-04
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2022 2:41:46 PM
Creation date
2/2/2021 4:03:57 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2021-12
Res Ord Title
R2021-12 Resolution Authorizing a Local Public Agency Agreement for Federal Participation with the State of Illinois to Improve the Center Street Bridge over Stevens Creek SN: 058-3061 City Project 2019-04
Department
Public Works
Approved Date
2/1/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A <br /> <� 111nois De artment Local Public Agency Agreement o 0 <br /> of Transportation for Federal Participation <br /> � ° <br /> LOCAL PUBLIC AGENCY <br /> Local Public Aciency County Section Number <br /> City of Decatur Macon 19-00904-00-BR <br /> Fund Type ITEP SRTS, HSIP Number(s) MPO Name MPO TIP Number <br /> STU _ N/A DUATS DEC19-12 <br /> ® Construction on State Letting ❑ Construction Local Letting ❑ Day Labor ❑ Local Administered Engineering ❑ Right-of-Way <br /> Construction Engineering Right of Way <br /> Job Number Project Number Job Number Project Number Job Number Project Number <br /> C-97-107-21 YBF1(666) _�I IF I IF —� <br /> This Agreement is made and entered into between the above local public agency, hereinafter referred to as the"LPA"and the State of <br /> Illinois,acting by and through its Department of Transportation,hereinafter referred to as"STATE".The STATE and LPA jointly propose to <br /> improve the designated location as described below.The improvement shall be consulted in accordance with plans prepared by,or on <br /> behalf of the LPA and approved by the STATE using the STATE's policies and procedures approved and/or required by the Federal <br /> Highway Administration,hereinafter referred to as"FHWA". <br /> LOCATION <br /> Stationing <br /> Local Street/Road Name ev Route Length From To <br /> West Center Street FAU 7374 0.01 mile 1.41 1.42 <br /> Location Termini <br /> 1.5 miles West of FAU 7429 at Stevens Creek <br /> Current Jurisdiction Existing Structure Number(s) Add Location` <br /> City of Decatur 58-3061 —� Remove <br /> PROJECT DESCRIPTION <br /> Complete removal and replacement of existing structure. <br /> LOCAL PUBLIC AGENCY APPROPRIATION-REQUIRED FOR STATE LET CONTRACTS <br /> By execution of this Agreement the LPA attests that sufficient moneys have been appropriated or reserved by resolution or ordinance to <br /> fund the LPA share of project costs.A copy of the authorizing resolution or ordinance is attached as an addendum. <br /> METHOD OFFINANCINO-(State-Let Contract Work Only) <br /> Check One <br /> ❑ METHOD A-Lump Sum(80%of LPA Obligation ) <br /> Lump Sum Payment-Upon award of the contract for this improvement,the LPA will pay the STATE within thirty(30)calendar days of <br /> billing,in lump sum,an amount equal to 80%of the LPA's estimated obligation incurred under this agreement.The LPA will pay to the <br /> STATE the remainder of the LPA's obligation(including any nonparticipating costs)in a lump sum within thirty(30)calendar days of billing <br /> in a lump sum, upon completion of the project based on final costs. <br /> ❑ METHOD B- Monthly Payments of due by the of each successive month. <br /> Monthly Payments-Upon award of the contract for this improvement,the LPA will pay to the STATE a specified amount each month for <br /> an estimated period of months,or until 80%of the LPA's estimated obligation under the provisions of the agreement has been paid.The <br /> LPA will pay to the STATE the remainder of the LPA's obligation(including any nonparticipating costs)in a lump sum,upon completion of <br /> the project based upon final costs. <br /> ® METHOD C-LPA's Share $260,000.00 divided by estimated total cost multiplied by actual progress payment. <br /> Progress Payments-Upon receipt of the contractor's first and subsequent progressive bills for this improvement,the LPA will pay to the <br /> STATE within thirty(30)calendar days of receipt,an amount equal to the LPA's share of the construction cost divided by the estimated <br /> total cost multiplied by the actual payment(appropriately adjust for nonparticipating costs)made to the contractor until the entire obligation <br /> incurred under this agreement has been paid. <br /> Printed 01/20/21 Page 1 of 6 BLR 05310(Rev.05/29120) <br />
The URL can be used to link to this page
Your browser does not support the video tag.