My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2021-27 Resolution Authorizing an Agreement with the State of Illinois for Improvements to U.S. 51 from its Intersection with Pershing Road (IL 121) North to its Intersection with Interstate 72 City Project 2021-06
COD
>
City Clerk
>
RESOLUTIONS
>
2021
>
R2021-27 Resolution Authorizing an Agreement with the State of Illinois for Improvements to U.S. 51 from its Intersection with Pershing Road (IL 121) North to its Intersection with Interstate 72 City Project 2021-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2022 11:38:04 AM
Creation date
3/2/2021 4:07:06 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2021-27
Res Ord Title
R2021-27 Resolution Authorizing an Agreement with the State of Illinois for Improvements to U.S. 51 from its Intersection with Pershing Road (IL 121) North to its Intersection with Interstate 72 City Project 2021-06
Department
Public Works
Approved Date
3/1/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
FAP 710 (Business U.S. 51) <br /> Section: (48Z2&3,50Z2&3,50R)RS-3 <br /> CITY Section: 21-00106-00-TL <br /> Macon County <br /> Job No.: C-97-083-13 <br /> Agreement No.: JN 721 003 <br /> Contract No.: 74637 <br /> AGREEMENT <br /> This agreement entered into this 17T-" day of N Wtr—K , A.D., 2021, by and between <br /> the STATE OF ILLINOIS, acting by and through its DEPARTMENT OF TRANSPORTATION <br /> hereinafter called the STATE, and the CITY OF DECATUR, in the State of Illinois, hereinafter <br /> called the CITY. <br /> WITNESSETH: <br /> WHEREAS, the STATE, in order to facilitate the free flow of traffic and ensure safety to <br /> the motoring public, is desirous of improving approximately 11,375 feet (2.15 miles) of FAP 710 <br /> (Business U.S. 51), State Section (48Z2&3,50Z2&3,50R)RS-3, CITY Section 21-00106-00-TL <br /> from its intersection with Pershing Road (IL 121) north to its intersection with Interstate 72 in <br /> Decatur, by milling and resurfacing, patching, repairing curb, gutter and medians, constructing <br /> Americans with Disabilities Act (ADA) compliant curb ramps, improving pedestrian signals of <br /> existing traffic signal systems, replacing existing bridge joints and by performing all other work <br /> necessary to complete the section in accordance with the approved plans and specifications; and <br /> WHEREAS, the improvements to FAP 710 (Business U.S. 51) shall consist of: <br /> 1. SOUTHBOUND BUSINESS U.S. 51 (MAIN STREET) FROM NORTH EDGE OF PAVEMENT <br /> OF PERSHING ROAD (IL 121) TO THE SOUTH APPROACH OF STRUCTURE NO. 058- <br /> 0004: Mill and resurface the existing hot-mix asphalt pavement, retaining the existing curbs <br /> and variable pavement width, providing for three 12-foot wide through traffic lanes (reducing <br /> to two lanes north of Christine Drive) and variable-width turn lanes, all in the southbound <br /> direction; <br /> 2. NORTHBOUND BUSINESS U.S. 51 (WATER STREET) FROM NORTH EDGE OF <br /> PAVEMENT OF PERSHING ROAD (IL 121)TO THE SOUTH APPROACH OF STRUCTURE <br /> NO. 058-0015: Mill and resurface the existing hot-mix asphalt pavement, retaining the existing <br />
The URL can be used to link to this page
Your browser does not support the video tag.