My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2021-27 Resolution Authorizing an Agreement with the State of Illinois for Improvements to U.S. 51 from its Intersection with Pershing Road (IL 121) North to its Intersection with Interstate 72 City Project 2021-06
COD
>
City Clerk
>
RESOLUTIONS
>
2021
>
R2021-27 Resolution Authorizing an Agreement with the State of Illinois for Improvements to U.S. 51 from its Intersection with Pershing Road (IL 121) North to its Intersection with Interstate 72 City Project 2021-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/27/2022 11:38:04 AM
Creation date
3/2/2021 4:07:06 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2021-27
Res Ord Title
R2021-27 Resolution Authorizing an Agreement with the State of Illinois for Improvements to U.S. 51 from its Intersection with Pershing Road (IL 121) North to its Intersection with Interstate 72 City Project 2021-06
Department
Public Works
Approved Date
3/1/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
25
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
curbs and variable pavement width, providing for three 12-foot wide through traffic lanes <br /> (reducing to two lanes north of Christine Drive) and variable-width turn lanes, all in the <br /> northbound direction; <br /> 3. STRUCTURE NUMBERS 058-0004 AND 058-0015 CARRYING BUSINESS US 51 OVER <br /> SPRING CREEK: Establish lane closures for stage construction and replace existing <br /> structure expansion joints; <br /> 4. BUSINESS U.S. 51 FROM THE NORTH ABUTMENT OF STRUCTURE NUMBERS 058- <br /> 0004 AND 058-0015 TO MARK AVENUE: Mill and resurface the existing hot-mix asphalt <br /> pavement, providing for a 70-foot edge-to-edge pavement width, retaining the existing curb <br /> and gutters and providing for four 12-foot wide through traffic lanes, two in each direction and <br /> a 22-foot wide and variable concrete median with variable width left-turn lanes; <br /> 5. MOUND AVENUE INTERSECTION (MARK AVENUE TO STEPHANIE DRIVE): Mill and <br /> resurface the existing variable-width pavement, retaining the existing variable-width concrete <br /> median and providing for two 12-foot wide through traffic lanes in each direction and 12-foot <br /> wide (and variable) left and right-turn lanes; modernize existing pedestiran signaling and <br /> improve curb ramps to comply with the Americans with Disabilities Act (ADA) at the <br /> intersection of FAP 710 (Business U.S. 51) and Mound Avenue; <br /> 6. STEPHANIE DRIVE TO MARYLAND HEIGHTS ROAD: Mill and resurface the existing hot- <br /> mix asphalt pavement, providing for a 70-foot edge-to-edge pavement width, retaining the <br /> existing curb and gutters and providing for four 12-foot wide through traffic lanes, two in each <br /> direction and a 22-foot wide and variable concrete median with variable width left-turn lanes; <br /> 7. ASH AVENUE INTERSECTION (MARYLAND HEIGHTS ROAD TO 675 FEET NORTH OF <br /> ASH AVENUE): Mill and resurface the existing variable-width pavement, retaining the existing <br /> variable-width concrete median and providing for two 12-foot wide through traffic lanes in each <br /> direction and 12-foot wide (and variable) left and right-turn lanes; modernize existing <br /> pedestrian signaling and improve curb ramps to comply with the Americans with Disabilities <br /> Act (ADA) at the intersection of FAP 710 (Business U.S. 51) and Ash Avenue; <br /> -2- <br />
The URL can be used to link to this page
Your browser does not support the video tag.