Laserfiche WebLink
Refer to Attachment B. <br /> § 4.1.2.2 A description of each Supplemental Service identified in Section 4.1.1 as the Owner's responsibility is <br /> provided below. <br /> (Describe in detail the Owner's Supplemental Services identified in Section 4.1.1 or,ifset forth in an exhibit,identify <br /> the exhibit.) <br /> I Owner shall retain consultant and provide Architect with Geotechnical Engineering subsurface soil reports and <br /> recommendations <br /> § 4.1.3 If the Owner identified a Sustainable Objective in Article 1,the Architect shall provide,as a Supplemental <br /> Service,the Sustainability Services required in AIA Document E204TUL-201?,Sustainable Projects Exhibit,attached <br /> to this Agreement.The Owner shalt compensate the Architect as provided in Section 11.2. <br /> § 4.2 Architect's Additional Services <br /> The Architect may provide Additional Services after execution of this Agreement without invalidating the Agreement. <br /> Except for services required due to the fault of the Architect,any Additional Services provided in accordance with this <br /> Section 4.2 shall entitle the Architect to compensation pursuant to Section 11.3 and an appropriate adjustment in the <br /> Architect's schedule. <br /> § 4.2.1 Upon recognizing the need to perform the following Additional Services,the Architect shall notify the Owner <br /> with reasonable promptness and explain the facts and circumstances giving rise to the need.The Architect shall not <br /> Proceed to provide the following Additional Services until the Architect receives the Owner's written authorization: <br /> .1 Services necessitated by a change in the Initial Information,previous instructions or approvals given by <br /> the Owner,or a material change in the Project including size,quality,complexity,the schedule in <br /> Exhibit A,the Owner's budget for Cost of the Work,or procurement or delivery method; <br /> .2 Services necessitated by the enactment or revision of codes,laws,or regulations,including changing or <br /> editing previously prepared Instruments of Service; <br /> .3 Changing or editing previously prepared Instruments of Service necessitated by official interpretations <br /> of applicable codes,laws or regulations that are either(a)contrary to specific interpretations by the <br /> applicable authorities having jurisdiction made prior to the issuance of the building permit,or(b) <br /> contrary to requirements of the Instruments of Service when those Instruments of Service were <br /> prepared in accordance with the applicable standard of care; <br /> .4 Services necessitated by decisions of the Owner not rendered in a timely manner or any other failure of <br /> performance on the part of the Owner or the Owner's consultants or contractors; <br /> .5 Preparing digital models or other design documentation for transmission to the Owner's consultants <br /> and contractors,or to other Owner-authorized recipients; <br /> .6 Preparation of design and documentation for alternate bid or proposal requests proposed by the Owner; <br /> .7 Preparation for,and attendance at,a public presentation,meeting or hearing; <br /> .8 Preparation for,and attendance at,a dispute resolution proceeding or legal proceeding,except where <br /> the Architect is party thereto; <br /> .9 Evaluation of the qualifications of entities providing bids or proposals; <br /> .10 Consultation concerning replacement of Work resulting from fire or other cause during construction; <br /> or, <br /> .11 Assistance to the Initial Decision Maker,if other than the Architect. <br /> § 4.2.2 To avoid delay in the Construction Phase,the Architect shall provide the following Additional Services,notify <br /> the Owner with reasonable promptness,and explain the facts and circumstances giving rise to the need.If,upon <br /> receipt of the Architect's notice,the Owner determines that all or parts of the services are not required,the Owner shall <br /> give prompt written notice to the Architect of the Owner's determination.The Owner shall compensate the Architect <br /> for the services provided prior to the Architect's receipt of the Owner's notice. <br /> .1 Reviewing a Contractor's submittal out of sequence from the submittal schedule approved by the <br /> Architect; <br /> .2 Responding to the Contractor's requests for information that are not prepared in accordance with the <br /> Contract Documents or where such information is available to the Contractor from a careful study and <br /> limit AIA Document 8101"—2017.CopyrightO 1974,1978,1987,1997,2007 and 2017 by The American Institute of Architects.All rights reserved.The'American <br /> Institute of Architects,""AIA,"the AIA Logo,and"AIA Contract Documents'are registered trademarks and may not be used without permission This document was 13 <br /> produced by AIA software at 14:36:09 ET on 04114/2021 under Order No.2035534887 which expires on 04110/2022,is not for resale,Is licensed for one-time use <br /> 1 only,and may only be used In accordance with do AIA Contract Documents*Terms of Service.To report copyright violations,e-mail copydghtesia org. <br /> User Notes: <br /> (1749244472) <br />