|
Refer to Attachment B.
<br /> § 4.1.2.2 A description of each Supplemental Service identified in Section 4.1.1 as the Owner's responsibility is
<br /> provided below.
<br /> (Describe in detail the Owner's Supplemental Services identified in Section 4.1.1 or,ifset forth in an exhibit,identify
<br /> the exhibit.)
<br /> I Owner shall retain consultant and provide Architect with Geotechnical Engineering subsurface soil reports and
<br /> recommendations
<br /> § 4.1.3 If the Owner identified a Sustainable Objective in Article 1,the Architect shall provide,as a Supplemental
<br /> Service,the Sustainability Services required in AIA Document E204TUL-201?,Sustainable Projects Exhibit,attached
<br /> to this Agreement.The Owner shalt compensate the Architect as provided in Section 11.2.
<br /> § 4.2 Architect's Additional Services
<br /> The Architect may provide Additional Services after execution of this Agreement without invalidating the Agreement.
<br /> Except for services required due to the fault of the Architect,any Additional Services provided in accordance with this
<br /> Section 4.2 shall entitle the Architect to compensation pursuant to Section 11.3 and an appropriate adjustment in the
<br /> Architect's schedule.
<br /> § 4.2.1 Upon recognizing the need to perform the following Additional Services,the Architect shall notify the Owner
<br /> with reasonable promptness and explain the facts and circumstances giving rise to the need.The Architect shall not
<br /> Proceed to provide the following Additional Services until the Architect receives the Owner's written authorization:
<br /> .1 Services necessitated by a change in the Initial Information,previous instructions or approvals given by
<br /> the Owner,or a material change in the Project including size,quality,complexity,the schedule in
<br /> Exhibit A,the Owner's budget for Cost of the Work,or procurement or delivery method;
<br /> .2 Services necessitated by the enactment or revision of codes,laws,or regulations,including changing or
<br /> editing previously prepared Instruments of Service;
<br /> .3 Changing or editing previously prepared Instruments of Service necessitated by official interpretations
<br /> of applicable codes,laws or regulations that are either(a)contrary to specific interpretations by the
<br /> applicable authorities having jurisdiction made prior to the issuance of the building permit,or(b)
<br /> contrary to requirements of the Instruments of Service when those Instruments of Service were
<br /> prepared in accordance with the applicable standard of care;
<br /> .4 Services necessitated by decisions of the Owner not rendered in a timely manner or any other failure of
<br /> performance on the part of the Owner or the Owner's consultants or contractors;
<br /> .5 Preparing digital models or other design documentation for transmission to the Owner's consultants
<br /> and contractors,or to other Owner-authorized recipients;
<br /> .6 Preparation of design and documentation for alternate bid or proposal requests proposed by the Owner;
<br /> .7 Preparation for,and attendance at,a public presentation,meeting or hearing;
<br /> .8 Preparation for,and attendance at,a dispute resolution proceeding or legal proceeding,except where
<br /> the Architect is party thereto;
<br /> .9 Evaluation of the qualifications of entities providing bids or proposals;
<br /> .10 Consultation concerning replacement of Work resulting from fire or other cause during construction;
<br /> or,
<br /> .11 Assistance to the Initial Decision Maker,if other than the Architect.
<br /> § 4.2.2 To avoid delay in the Construction Phase,the Architect shall provide the following Additional Services,notify
<br /> the Owner with reasonable promptness,and explain the facts and circumstances giving rise to the need.If,upon
<br /> receipt of the Architect's notice,the Owner determines that all or parts of the services are not required,the Owner shall
<br /> give prompt written notice to the Architect of the Owner's determination.The Owner shall compensate the Architect
<br /> for the services provided prior to the Architect's receipt of the Owner's notice.
<br /> .1 Reviewing a Contractor's submittal out of sequence from the submittal schedule approved by the
<br /> Architect;
<br /> .2 Responding to the Contractor's requests for information that are not prepared in accordance with the
<br /> Contract Documents or where such information is available to the Contractor from a careful study and
<br /> limit AIA Document 8101"—2017.CopyrightO 1974,1978,1987,1997,2007 and 2017 by The American Institute of Architects.All rights reserved.The'American
<br /> Institute of Architects,""AIA,"the AIA Logo,and"AIA Contract Documents'are registered trademarks and may not be used without permission This document was 13
<br /> produced by AIA software at 14:36:09 ET on 04114/2021 under Order No.2035534887 which expires on 04110/2022,is not for resale,Is licensed for one-time use
<br /> 1 only,and may only be used In accordance with do AIA Contract Documents*Terms of Service.To report copyright violations,e-mail copydghtesia org.
<br /> User Notes:
<br /> (1749244472)
<br />
|