Laserfiche WebLink
above and below grade,including inverts and depths.All the information on the survey shall be referenced to a Project <br /> benchmark. <br /> 15.5 The Owner shall furnish services of geotechnical engineers,which may include test borings,test pits, <br /> determinations of soil bearing values,percolation tests,evaluations of hazardous materials,seismic evaluation,ground <br /> corrosion tests and resistivity tests,including necessary operations for anticipating subsoil conditions,with written <br /> reports and appropriate recommendations. <br /> § 5.6 The Owner shall provide the Supplemental Services designated as the Owner's responsibility in Section 4.1.1. <br /> § 5.7 If the Owner identified a Sustainable Objective in Article 1,the Owner shall fulfill its responsibilities as required <br /> in AIA Document E204Tm-2017,Sustainable Projects Exhibit,attached to this Agreement. <br /> (Paragraph deleted) <br /> § 5.8.1 The Owner shall coordinate the services of its own consultants with those services provided by the Architect. <br /> Upon the Architect's request,the Owner shall furnish copies of the scope of services in the contracts between the <br /> Owner and the Owner's consultants.The Owner shall famish the services of consultants other than those designated as <br /> the responsibility of the Architect in this Agreement,or authorize the Architect to furnish them as an Additional <br /> Service,when the Architect requests such services and demonstrates that they are reasonably required by the scope of <br /> the Project.The Owner shall require that its consultants and contractors maintain insurance,including professional <br /> liability insurance,as appropriate to the services or work provided. The Owner shall indemnify,defend and hold <br /> harmless the Architect and the Architect's consultants and their respective employees,agents and representatives from <br /> any and all claims arising out of the services and information furnished by the Owner and the Owner's consultants. <br /> § 5.8.2 The Owner shall carry,or require the Contractor to carry,adequate liability,property and fire insurance on the <br /> property where the Project is located and for the Project. Owner must present Architect with a certificate of insurance <br /> upon the signing of this Agreement. Owner hereby releases Architect from any liability for any loss or damage to any <br /> building,structure or tangible personal property notwithstanding that such loss,damage or liability may arise out of <br /> the act or omission of Architect,if such loss or damage is covered by insurance benefiting Owner or was required to be <br /> covered by insurance pursuant to this Agreement. <br /> § 5.8.3 Owner shall require the Contractor and its Subcontractors to purchase insurance to cover claims and other <br /> expenses,including costs of defense,asserted against Architect,its agents,employees and consultants for bodily <br /> injury,sickness,disease or death caused by any negligent act or omission of the Contractor,any Subcontractor,anyone <br /> directly or indirectly employed by them or anyone for whose acts any of them may be liable.Such insurance shall <br /> state: "The coverage afforded the additional insureds shall be primary insurance for the insured or additional insured <br /> with respect to claims arising out of operations performed by or on behalf of the named insured.If the additional <br /> insureds have other insurance which is applicable to the loss,such other insurance shall be treated as excess or <br /> contingent coverage.The extent of the insurer's liability under this insurance policy shall not be reduced by the <br /> existence of such other insurance." <br /> § 5.8.4 The Owner agrees to include in all agreements and documentation connected with this Project,including but <br /> not limited to design and construction contracts and agreements binding on any purchasers of the property or Project, <br /> waivers of subrogation against all of the other parties to the Project. <br /> § 5.9 The Owner shall furnish tests,inspections and reports required by law or the Contract Documents,such as <br /> structural,mechanical,and chemical tests,tests for air and water pollution,and tests for hazardous materials.Unless <br /> otherwise disclosed and arranged for disposal,Owner represents to Architect that no hazardous or toxic substances <br /> within the meaning of any applicable statute or regulation are presently stored,or otherwise located on the Project site <br /> or adjacent thereto.Further,within the definition of such statutes or regulations,no part of the Project site or adjacent <br /> real estate,including the ground water located thereon,is presently contaminated with such substances. To the fullest <br /> extent permitted by law,Owner shall indemnify and defend Architect and Owner shall indemnify and defend <br /> Architect and Architect's consultants from and against any and all claims,losses,damages,liabilities and expenses, <br /> including attorneys'fees and expenses,arising out of or resulting from the presence,removal or remediation of <br /> hazardous materials at the Project site. <br /> Inst. AIA Document B101"—2017.Copyright®1974,1978,1987,1997,2007 and 2017 by The American Institute of Architects.AN rights reserved.The"American <br /> Institute of Architects;'AIA;the AIA Logo,and"AIA Contract Documents"are registered trademarks and may not be used without permission This documenlwas 15 <br /> produced by AIA software at 14:38:09 ET on 04/14/2021 under Order No.2035534887 which expires on 04/1012022,Is not for resale,is licensed for one-time use <br /> l only,and may only be used in accordance with the AIA Contract Documents*Tents of Service.To report copyright violations,e-mail eopyrightCaia_org. <br /> User Notes: (1749244472) <br />