above and below grade,including inverts and depths.All the information on the survey shall be referenced to a Project
<br /> benchmark.
<br /> 15.5 The Owner shall furnish services of geotechnical engineers,which may include test borings,test pits,
<br /> determinations of soil bearing values,percolation tests,evaluations of hazardous materials,seismic evaluation,ground
<br /> corrosion tests and resistivity tests,including necessary operations for anticipating subsoil conditions,with written
<br /> reports and appropriate recommendations.
<br /> § 5.6 The Owner shall provide the Supplemental Services designated as the Owner's responsibility in Section 4.1.1.
<br /> § 5.7 If the Owner identified a Sustainable Objective in Article 1,the Owner shall fulfill its responsibilities as required
<br /> in AIA Document E204Tm-2017,Sustainable Projects Exhibit,attached to this Agreement.
<br /> (Paragraph deleted)
<br /> § 5.8.1 The Owner shall coordinate the services of its own consultants with those services provided by the Architect.
<br /> Upon the Architect's request,the Owner shall furnish copies of the scope of services in the contracts between the
<br /> Owner and the Owner's consultants.The Owner shall famish the services of consultants other than those designated as
<br /> the responsibility of the Architect in this Agreement,or authorize the Architect to furnish them as an Additional
<br /> Service,when the Architect requests such services and demonstrates that they are reasonably required by the scope of
<br /> the Project.The Owner shall require that its consultants and contractors maintain insurance,including professional
<br /> liability insurance,as appropriate to the services or work provided. The Owner shall indemnify,defend and hold
<br /> harmless the Architect and the Architect's consultants and their respective employees,agents and representatives from
<br /> any and all claims arising out of the services and information furnished by the Owner and the Owner's consultants.
<br /> § 5.8.2 The Owner shall carry,or require the Contractor to carry,adequate liability,property and fire insurance on the
<br /> property where the Project is located and for the Project. Owner must present Architect with a certificate of insurance
<br /> upon the signing of this Agreement. Owner hereby releases Architect from any liability for any loss or damage to any
<br /> building,structure or tangible personal property notwithstanding that such loss,damage or liability may arise out of
<br /> the act or omission of Architect,if such loss or damage is covered by insurance benefiting Owner or was required to be
<br /> covered by insurance pursuant to this Agreement.
<br /> § 5.8.3 Owner shall require the Contractor and its Subcontractors to purchase insurance to cover claims and other
<br /> expenses,including costs of defense,asserted against Architect,its agents,employees and consultants for bodily
<br /> injury,sickness,disease or death caused by any negligent act or omission of the Contractor,any Subcontractor,anyone
<br /> directly or indirectly employed by them or anyone for whose acts any of them may be liable.Such insurance shall
<br /> state: "The coverage afforded the additional insureds shall be primary insurance for the insured or additional insured
<br /> with respect to claims arising out of operations performed by or on behalf of the named insured.If the additional
<br /> insureds have other insurance which is applicable to the loss,such other insurance shall be treated as excess or
<br /> contingent coverage.The extent of the insurer's liability under this insurance policy shall not be reduced by the
<br /> existence of such other insurance."
<br /> § 5.8.4 The Owner agrees to include in all agreements and documentation connected with this Project,including but
<br /> not limited to design and construction contracts and agreements binding on any purchasers of the property or Project,
<br /> waivers of subrogation against all of the other parties to the Project.
<br /> § 5.9 The Owner shall furnish tests,inspections and reports required by law or the Contract Documents,such as
<br /> structural,mechanical,and chemical tests,tests for air and water pollution,and tests for hazardous materials.Unless
<br /> otherwise disclosed and arranged for disposal,Owner represents to Architect that no hazardous or toxic substances
<br /> within the meaning of any applicable statute or regulation are presently stored,or otherwise located on the Project site
<br /> or adjacent thereto.Further,within the definition of such statutes or regulations,no part of the Project site or adjacent
<br /> real estate,including the ground water located thereon,is presently contaminated with such substances. To the fullest
<br /> extent permitted by law,Owner shall indemnify and defend Architect and Owner shall indemnify and defend
<br /> Architect and Architect's consultants from and against any and all claims,losses,damages,liabilities and expenses,
<br /> including attorneys'fees and expenses,arising out of or resulting from the presence,removal or remediation of
<br /> hazardous materials at the Project site.
<br /> Inst. AIA Document B101"—2017.Copyright®1974,1978,1987,1997,2007 and 2017 by The American Institute of Architects.AN rights reserved.The"American
<br /> Institute of Architects;'AIA;the AIA Logo,and"AIA Contract Documents"are registered trademarks and may not be used without permission This documenlwas 15
<br /> produced by AIA software at 14:38:09 ET on 04/14/2021 under Order No.2035534887 which expires on 04/1012022,Is not for resale,is licensed for one-time use
<br /> l only,and may only be used in accordance with the AIA Contract Documents*Tents of Service.To report copyright violations,e-mail eopyrightCaia_org.
<br /> User Notes: (1749244472)
<br />
|