My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2021-65 Resolution Authorizing City Manager to Enter into a Professional Services Agreement with Dewberry Architects, Inc. for Design, Bidding, and Construction Oversight Services for New Fire Station No. 7
COD
>
City Clerk
>
RESOLUTIONS
>
2021
>
R2021-65 Resolution Authorizing City Manager to Enter into a Professional Services Agreement with Dewberry Architects, Inc. for Design, Bidding, and Construction Oversight Services for New Fire Station No. 7
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/21/2021 1:11:27 PM
Creation date
4/21/2021 1:11:24 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2021-65
Res Ord Title
R2021-65 Resolution Authorizing City Manager to Enter into a Professional Services Agreement with Dewberry Architects, Inc. for Design, Bidding, and Construction Oversight Services for New Fire Station No. 7
Department
City Manager
Approved Date
4/19/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Decatur <br /> April 14,2021 <br /> Page 2 of 6 <br /> Office computations and final documents <br /> • Close and adjustfield traverse,compile allfield data. <br /> • Analyze existing property and section corner locations. <br /> • Prepare Topographic Survey drawing. Provide AutoCAD (.dwg)drawings as per Dewberry survey <br /> requirements. <br /> Assumptions: None. <br /> Exclusions: Architect, Landscape Architect, Mechanical, Electrical, Plumbing, Technology/Security, <br /> and Civil Engineering <br /> Deliverables: <br /> • AutoCAD files <br /> • Pointfiles, field notes, pictures on CD. <br /> Price:Reference Price and Payment <br /> Schedule: Completed within 4 Weeks of the start of the project. <br /> Task 2: Geotechnical Engineering(Ramsey Geotechnical Engineering) <br /> Dewberry to provide oversight and coordination of geotechnical engineering. <br /> Assumptions: City of Decatur direct contracts with Ramsey Geotechnical Engineer. <br /> Exclusions: Architect, Landscape Architect, Mechanical, Electrical, Plumbing, Technology/Security, <br /> and Civil Engineering <br /> Deliverables: Electronic Files in PDF, TIFF, and/or JPG format <br /> Price: Reference Price and Payment <br /> Schedule: Completed within 3 weeks of the execution of contract. <br /> Task 4: N/A <br /> Task 5: Construction Documents <br /> The Architect will perform the following during Construction Documents based on the Owner's approval of <br /> the Design Development Documents. Reference AIA contract B101 —2007 for additional information. <br /> •Manage the design team <br /> •Coordination of the MEP/T, Landscape Architect, and Civil Engineering work <br /> •Complete the plans, elevations, sections and details <br /> •Finalize interior design and selection of finishes <br /> Dewberry Scope of Work Fire Station 7—City of Decatur <br />
The URL can be used to link to this page
Your browser does not support the video tag.