My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2021-84 Resolution Accepting the Quote and Authorizing the Execution of a Contract with W.J. Scott Company for Municipal Services Fuel System Improvements
COD
>
City Clerk
>
RESOLUTIONS
>
2021
>
R2021-84 Resolution Accepting the Quote and Authorizing the Execution of a Contract with W.J. Scott Company for Municipal Services Fuel System Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2022 3:42:28 PM
Creation date
5/5/2021 11:18:30 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2021-84
Res Ord Title
R2021-84 Resolution Accepting the Quote and Authorizing the Execution of a Contract with W.J. Scott Company for Municipal Services Fuel System Improvements
Department
Public Works
Approved Date
5/3/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A <br /> W.J. SCOTT COMPANY <br /> 3861 TOZER ROAD—SPRINGFIELD,11.62707 <br /> 217/787-6081 FAX: 2171787-3653 <br /> PETROLEUMEQUIPMENT SALES,SERVICE,DESIGN,CONSTRUCTION,INSTALLA77ONAND REMOVAL <br /> February 10,2021 <br /> City of Decatur <br /> Accounting Division <br /> #1 Gary K.Anderson Plaza <br /> Decatur, Illinois 62523-1196 <br /> I. FUEL PUMP REPLACEMENT <br /> W J Scott Company to arrive at site,remove all(5)existing dispensers on east canopy <br /> islands and install.We will hookup to new and existing conduits product line,anchor <br /> down.Reinstall hose assembly,wire,program,calibrate and test for proper operation. <br /> (3) New Bennett 33711 SNR-17-P electronic single product side hose outlet, remote <br /> puller,interface board,red for gas. 3,910.47 ea.x 3 = .............................. 11,731.41 <br /> (2)New Bennett 3712SNR-21-P electronic single product dual hose side outlet, <br /> remote pulser interface board,green for diesel 6,152.12 ea.x 2=................ 12,304.24 <br /> Shipping..................................................................................... 870.00 <br /> Misc.fittings,etc........................................................................... 1,200.00 <br /> Labor. ..................................................................................... 8,250.00 <br /> TOTAL....................................................................................$34,355.65 <br /> 1I. MAINTENANCE GARAGE—SITE SOFTWARE&KEYS <br /> (1)227838A FuelMaster Plus Windows Software SQL..............................2,025.00 <br /> (430) 172405 Black Prokee's 5.40ea......................................................2,322.00 <br /> (1)941DO120 Prokee USB Encoder....................................................... 552.60 <br /> Labor to install software on site,program,train site on setting up prokee's&reports.....1,200.00 <br /> TOTAL.......................................................................................S 6,099.60 <br /> I1I. NORTH GAS PUMP <br /> (1)FMU-3505PLUSG Prokee Master Unit............................................ 8,341.20 <br /> (1)941H0219A Deliberant wireless install kit......................................... 567.00 <br /> Labor,travel and mileage..�.............................................................. 2,950.00 <br /> 2`d Year Maintenance and Labor Warranty............................................. 1,675.00 <br /> TOTAL....................................................................................$13,533.20 <br /> 1 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.