My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2021-106 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Kinney Contractors, Inc. for Concrete and Brick Street Rehabilitation, City Project 2021-11
COD
>
City Clerk
>
RESOLUTIONS
>
2021
>
R2021-106 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Kinney Contractors, Inc. for Concrete and Brick Street Rehabilitation, City Project 2021-11
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2022 2:41:46 PM
Creation date
6/9/2021 5:27:32 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2021-106
Res Ord Title
R2021-106 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Kinney Contractors, Inc. for Concrete and Brick Street Rehabilitation, City Project 2021-11
Department
Public Works
Approved Date
6/7/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPECIAL PROVISIONS <br /> SP-2 TRAFFIC CONTROL (CONTINUED) <br /> Traffic Standard 701606: This standard shall be utilized for lane closures on multi-lane <br /> streets. <br /> Traffic Standard 701701: This standard shall be utilized for lane closures within multi-lane <br /> intersections. <br /> Standard 701901 shall be used for the applicable traffic control devices needed. <br /> Standard BLR 22 shall be used for road closures. <br /> All additional traffic control as required in the standard details that are not specifically <br /> provided for herein will be considered as included with the various pay items requiring traffic <br /> control. <br /> The Engineering Division will erect "No Parking" signs 24 hours prior to the start of work <br /> on a street, in an attempt to have all vehicles removed from the street. The City will not be held <br /> responsible for any delays due to the City having to have parked vehicles moved. The Contractor <br /> shall furnish the Engineer with suitable hardwood quality lath for installation of temporary "No <br /> Parking" signs. <br /> Basis of Payment: All labor and materials necessary to comply with this special provision <br /> will not be paid for separately but will be included with related work items. <br /> SP-3 RESTORATION AND SEEDING <br /> Description: Existing grass areas disturbed by construction or removal of the various work <br /> items under this contract shall be restored by properly filling and grading all disturbed areas with <br /> soil that is properly prepared for seed application and then seeding and mulching the area in <br /> accordance with Sections 250 and 251 of the Standard Specifications for Class IA Seeding and <br /> Method I or Method 3 Mulching as directed by the Engineer.Fertilizer will not be required. <br /> Basis of Payment: Cost of the work will not be aid for separately but shall be <br /> Y P <br /> considered as included with the various work items involved.. <br /> SP-4 CONTAMINANT CONTROL AND INLET PROTECTION <br /> Description: Care should be used to help minimize any sediment or other fine materials <br /> leaving the job site. Any open inlet or catch basin shall be protected from sediment infiltration <br /> using the standards outlined in the Illinois Urban Manual for INLET PROTECTION or by using an <br /> equivalent approved by the Engineer. Inlets shall be protected before any sawing,excavation, or ' <br /> pavement removal commences. Concrete shall be washed out in an approved lined container that <br /> complies with the Illinois Urban Manual standards. <br /> 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.