Laserfiche WebLink
6/17/2021 Item Coversheet <br /> Public Works <br /> DATE: 6/10/2021 <br /> MEMO: 2021-62 <br /> TO: Honorable Mayor Moore Wolfe and City Council Members <br /> FROM: Scot Wrighton,City Manager <br /> Matt Newell,P.E.,Public Works Director <br /> SUBJECT: Resolution Authorizing a Professional Engineering Services Agreement with AECOM Technical Services,Inc. <br /> to provide preliminary design services for the Oakland and Grand Area Sewer Separation Study,City Project 2021-01. <br /> SUMMARY RECOMMENDATION: <br /> It is recommended that the City Council approve the attached Resolution authorizing the Mayor to sign,and the City Clerk to <br /> attest,to a Professional Engineering Services Agreement between the City of Decatur and AECOM Technical Services,Inc. <br /> (AECOM)to provide preliminary design services for the Oakland and Grand Area Sewer Separation Study,for a total fee not to <br /> exceed$199,146.00. <br /> SANITARY SEWER PRIORITIES: <br /> Under the direction of the City Council,the Public Works Department has established four priorities to improve the City's sanitary sewer collection system as <br /> defined in the Sanitary Sewer Master Plan. <br /> 1. Critical Large Diameter Sewer Rehabilitation. <br /> 2. Sanitary Sewer Overflows Due to Inflow and Infiltration. <br /> 3. System Operation and Maintenance <br /> 4. Small Diameter Sewer Rehabilitation <br /> The Professional Engineering Services Agreement with AECOM will address sanitary sewer priorities 2,3,and 4. <br /> BACKGROUND: <br /> Administrative Consent Order <br /> In 2012,the United States Environmental Protection Agency(US EPA)served Decatur with an Administrative Consent Order <br /> (ACO),requiring the City to eliminate overflows and reduce basement backups. The City retained outside legal counsel with <br /> expertise and direct experience in US EPA administration of the Clean Water Act. With the assistance of outside counsel and <br /> AECOM,extensive negotiations between the City and the US EPA resulted in the US EPA's issuance of an ACO that was greatly <br /> limited in scope compared to the initial Order. This was in large measure due to the City's ongoing commitment to improving its <br /> sanitary sewer systems,and its good faith efforts to negotiate a reasonable ACO with the US EPA. <br /> The Administrative Consent Order's major requirements includes: <br /> 1. The development of a Capacity Management,Operations,and Maintenance(CMOM)program. The CMOM program <br /> provides a comprehensive review of the City's sewer collection system,including system management,maintenance,and capital <br /> improvement funding. The City's CMOM program was approved by the USEPA on May 1,2018 and has been implemented as <br /> required by the ACO. <br /> 2. The preparation of a Sewer Collection System Alternatives Analysis(SCSAA)for areas identified to be experiencing <br /> Sanitary Sewer Overflows(SSOs)and sewer back-ups during storm events. This analysis is focused on keeping storm water from <br /> entering into the separate sanitary sewer system and to better manage stormwater entering the combined sewer system. <br /> US EPA Administrative Consent Order Status <br /> The current version of the City's Sanitary Sewer Collection System Analysis(SCSAA)identified four top priority areas of the City <br /> experiencing high inflow and infiltration during storm events. It should be noted that these are not the only areas in the City with <br /> high rain induced sewer problems,but these are the highest priority areas: <br /> 1.North Lost Bridge Area <br /> hfps://decatur.novusagenda.com/AgendaWeb/CoverSheet.aspx?ItemID=3454 1/3 <br />