6/17/2021 Item Coversheet <br /> 2. Florian Avenue Area <br /> 3. Grand and Oakland Area(Basin 5&6 in the SCSAA) <br /> 4.Ellen/Division Area <br /> The Oakland and Grand area was identified in the SCSAA due to its history of wet weather basement backups. The predominant <br /> cause of basement backups in this area is the combined sanitary sewers where both sanitary sewage and storm water are carried in <br /> the same pipe. Combined sewers still serve nearly 40%of the City,mostly in the older areas.The Grand and Oakland area is the <br /> only location on the high priority list that is served by combined sewers. <br /> The City has not received any correspondence regarding the SCSAA from the USEPA since the current version was submitted on <br /> November 30,2017. The plan has still not received final approval;however,following discussions with the City Council in the <br /> fall of 2020,it was determined to move forward in addressing the four priority sewer problems. The design process for each area <br /> follows this general pattern: <br /> 1. Start with a preliminary review to determine the scope of the inflow and infiltration problems in an area and identify <br /> options to address them. <br /> 2.Using the results of the preliminary review,complete a final design, including contract drawings and specifications for <br /> bidding. <br /> 3.Bid and award the project. <br /> 4. Complete the project. <br /> 5.Review the system to determine if enough inflow and infiltration was removed. If necessary take additional steps. <br /> The table below provides the project status of each priority area. <br /> Project Name Preliminary Design Final Design <br /> I North Lost Bridge Area Preliminary Completed in 2017 <br /> Study <br /> 2 Florian Ave Area Preliminary Study Completed in 2017 <br /> 3 Oakland and Grand Area Proposed Begin 2021 <br /> 4 Ellen and Division Preliminary Study Completed in 2018 75%Complete <br /> Ellen and Division Final Design <br /> Professional Services Agreement <br /> The October 2020 storm and sanitary sewer study session with the City Council provided direction to City staff to proceed with the <br /> Ellen/Division and Oakland/Grand Areas. The Ellen and Division Inflow and Infiltration(I&I)Reduction Project final design is <br /> approximately 75%complete. It is planned to advertise the project for bid late summer. <br /> The Grand and Oakland Sewer Separation Study will review the combined sewer area shown on the attached location map. This <br /> area was identified in the SCSAA due to it having one of the highest clusters of wet weather basement backups. The combined <br /> sewer network in this area is undersized compared to many other combined sewer areas. The project corridor is in an older urban <br /> area and it is expected to require detailed coordination with IDOT,the Norfolk Southern Railroad,the Sanitary District of Decatur, <br /> and the Decatur Park District. <br /> The Agreement with AECOM will provide the following services. <br /> 1.Evaluation of the existing drainage system—AECOM will review and calculate the drainage requirements of the <br /> Oakland and Grand drainage area,identified as Basins 5 &6 in the SCSAA. <br /> 2.Review of televised sewer inspections. <br /> 3.Prepare options and alternatives-AECOM will provide options to fully and partially separate the area to reduce <br /> basement backups. Hydraulic modeling of the existing combined sewer system may be required depending on the <br /> selected alternative. <br /> 4. Meeting with stake holders-Meetings with IDOT, Sanitary District of Decatur,Decatur Park District,Norfolk <br /> Southern and Public may be required in the determination of options. <br /> 5.Final Report-A final report will be provided detailing the findings and providing a recommended alternative. This <br /> final report will be the basis of determining the scope of services for a final design agreement. <br /> The cost for the preliminary design is not to exceed$199,146. <br /> PRIOR COUNCIL ACTION: <br /> See Appendix A. <br /> https:Hdecatur.novusagenda.com/AgendaWeb/CoverSheet.aspx?ItemID=3454 2/3 <br />