Laserfiche WebLink
13 <br /> ENVIRONMENTAL <br /> City of Decatur,IL ,G-�- SERV/CEV <br /> Staff and Resumes <br /> ADS Staff who will be utilized for this Project <br /> i • 2S Years of Hydraulic Services <br /> i Management <br /> • Primary Project Lead for all Illinois& <br /> Steve Huggins Indiana Work <br /> t SHuggins@idexcorp.com Project Manager • Project Coordination in Leak Survey <br /> (312)243-9440 Services <br /> • Technical Report Writing <br /> • Highly Skilled in Data Management <br /> and Water Loss Reports <br /> • 15 Years of Leak Detection Experience <br /> • Experience in Hydraulic Engineering <br /> services including flow and pressure <br /> measurements,hydraulic grades,fire <br /> flow tests,valve turning,and leak <br /> Terry Keeling detection <br /> TKeeling@idexcorp.com Leak Technician • Lead Leak Technician for: <br /> (312)243-9440 o Chicago,IL <br /> o Skokie,IL <br /> o Woodridge,IL <br /> o Decatur,IL <br /> • Thoroughly trained in the FCS and <br /> Echologics leakage equipment <br /> • 5 Years of Leak Detection Experience <br /> • Experience in Hydraulic Engineering <br /> services including leak detection,flow <br /> and pressure measurements,fire flow <br /> *Victor Colon tests,valve turning,and water <br /> VColon@idexcorp.comLeak Technician distribution system analysis <br /> (312)243-9440 • Lead Leak Technician for: <br /> o Darien,IL <br /> o Crystal Lake,IL <br /> o Decatur,IL <br /> • Thoroughly trained in the FCS and <br /> Echologics leakage equipment <br /> 10 Years of Experience <br /> • Experienced in Technical Reporting, <br /> Data QAQC,Mapping,GIS,and Analysis <br /> * • Lead Analyst for all Water Services <br /> Ana Tarina <br /> .v.. ATarina@idexcorp.com Data Analyst work performed by ADS <br /> j (312)243-9440 • Project Include: <br /> I o Chicago, IL(GIS&report) <br /> j o Crystal Lake,IL(report) <br /> i <br /> o Decatur,IL(GIS&report) <br /> o Naperville,IL(GIS&report) <br /> *Full Resumes are available upon request—and if they should they be needed. Staff details were summarized to stay within <br /> the page limitations required in the RFP. <br />