My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2021-148 Resolution to Approve Professional Services Agreement with ADS Environmental Services to Perform the Water Distribution Leak Detection Survey Project, City Project 2021-39
COD
>
City Clerk
>
RESOLUTIONS
>
2021
>
R2021-148 Resolution to Approve Professional Services Agreement with ADS Environmental Services to Perform the Water Distribution Leak Detection Survey Project, City Project 2021-39
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/18/2021 9:28:22 AM
Creation date
8/18/2021 9:28:18 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2021-148
Res Ord Title
R2021-148 Resolution to Approve Professional Services Agreement with ADS Environmental Services to Perform the Water Distribution Leak Detection Survey Project, City Project 2021-39
Department
Public Works
Approved Date
8/16/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
�4 s <br /> Steve Huggins = a. <br /> • <br /> r j, C pr c ie t k_Za <br /> 935 W.ChestnuL Street. -Suite 415, Chica(-o, 11, 60642 <br /> ',"NXIV.0(Ise 11 ,X0I], - �;IItI219iIIs0)idexcorp.com - (3 ice) <br /> • Project Manager for ADS&Decatur, IL since 2oo8 <br /> • Manages all Leak Technicians assigned to Illinois Projects <br /> • Team Lead for all ADS Water Loss Control Studies <br /> • Highly Skilled in Data Management and Water Loss Reports <br /> Skills Hydraulic Engineering Services *1 „ <br /> Water Loss Control Reports <br /> Data Management <br /> Valve Assessment and Exercising. <br /> "C"Factor Testing,Flow Testing, Pressure Testing <br /> Projects DECATUR, IL-LEAK DETECTION SURVEY 2008-2019 <br /> Currently the Project Manager for the City of Decatur,IL Leak Detection Program.Following a <br /> successful project in 20o8,ADS has been awarded multi-year projects surveying the entire water <br /> distribution system,usually surveying 1/3 of the system annually.Steve's team has assisted the City <br /> with emergency leak callout as they arise and has also assisted the City in larger diameter water <br /> meter testing services,from time-to-time,to confirm the accuracy of the meters. <br /> CHICAGO, IL-HYDRAULIC ENGINEERING SERVICES 2000-2022 <br /> Currently the Project Manager for the Chicago,IL Hydraulic Engineering Services. Mr.Huggins is <br /> responsible for the coordination and management of the entire project team. Mr.Huggins is <br /> dedicated to ensuring work is completed on-time and within budget for the City of Chicago DWM <br /> staff. Other duties include the day-today assignments that are issues by the City,progress reports, <br /> project meetings,and field testing results and reports. <br /> Education CHELTENHAM AND GLOUCESTER COLLEGE 1991 <br /> HNC/ONC in Civil Engineering(B.S.) <br /> Major Project-s <br /> Project/Utility Project Manager Commitment(%) <br /> Chicago,IL 65% <br /> Naperville,IL 10% <br /> Lockport,IL 10% <br /> Other Projects(as needed) 15%(D.U.R.) <br /> ,eo�ENVIRONMENTAL <br /> SERV/CES <br />
The URL can be used to link to this page
Your browser does not support the video tag.