Laserfiche WebLink
2021 Trenchless Long Lining Repairs Project <br /> City Project 2021-28 <br /> July 29, 2021 <br /> ADDENDUM NO. 1 <br /> TO PLANS,SPECIFICATIONS AND CONTRACT DOCUMENTS FOR: <br /> 2021 TRENCHLESS LONG LINING REPAIRS PROJECT <br /> CITY PROJECT 2021-28 <br /> DATED July,2021 <br /> AD-1-1 NOTICE <br /> 1.01 This Addendum No. 1 dated July 29,2021, to the Plans, Specifications <br /> and Contract Documents for the above captioned project, supersedes all <br /> contrary and conflicting information of the above mentioned bid proposal <br /> documents,which are hereby supplemented in certain particulars as <br /> follows: <br /> AD-1-2 PRE-BID MEETING <br /> 1.02 Add the attached pre-bid meeting sign-in sheet and meeting minutes from <br /> the Pre-Bid Meeting on May 27, 2020. <br /> AD-1-3 BID FORM <br /> 1.03 Remove Page 18 of the Bid form and replace with the Attached ADD No <br /> 1-18 Bid Form. <br /> AD-14 SP-2 COMPLETION DATE <br /> 1.04 Add the following paragraph at the end of Special Provision SP-2 <br /> Completion Date. <br /> An intermediate completion date of October 8.2021 has been <br /> established for Storm Sewer Locations 100, 101, 102, 103 & 105,for <br /> this contract as set forth in Section 108 of the"Standard Specification <br /> for Road and Bridge Construction."All applicable provision of <br /> Section 108 shall apply for this value of work. <br /> AD-1-5 SANITARY SEWER TECHNICAL SPECIFICATIONS—SECTION <br /> 2: FULL LENGTH CURED IN PLACE LINER <br /> 1.05 The following information shall be Added from the first paragraph of <br /> Section 2.7 Installation, subsection(h) Curing. <br /> Page 1 of 3 <br />