My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2021-150 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Insituform Technologies USA, LLC for 2021 Trenchless Long Lining Repairs City Project 2021-28
COD
>
City Clerk
>
RESOLUTIONS
>
2021
>
R2021-150 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Insituform Technologies USA, LLC for 2021 Trenchless Long Lining Repairs City Project 2021-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2022 8:44:29 AM
Creation date
8/18/2021 12:56:34 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
2021-150
Res Ord Title
2021-150 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Insituform Technologies USA, LLC for 2021 Trenchless Long Lining Repairs City Project 2021-28
Department
Public Works
Approved Date
8/16/2021
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(h) Curing.After the installation of the liner is completed,the <br /> Contractor shall cure the liner in strict accordance with ASTM and the <br /> manufacturer's recommendations. The curing process shall take into <br /> account the existing pipe material,the resin system,and ground conditions <br /> (temperature,moisture content,thermal conductivity, etc.). The heat <br /> source piping shall be fitted with continuous monitoring temperature <br /> gauges to monitor the temperature of the incoming and outgoing steam or <br /> water supply. Water will be provided to the contractor at no cost as per <br /> GC 27. Temperature gauges shall also be placed between the tube and <br /> hoist pipe at the start,middle if existing access points are available or if <br /> multiple structures are lined through in one shot unless the total <br /> length of liner is less than 300 feet and end of the pipe segment being <br /> lined continuously monitor the temperature during the curing process. <br /> Temperature of the impregnated CIPP during transport and before cure <br /> shall not drop below the minimum temperature as allowed by the <br /> manufacturer and ASTM standards. <br /> AD-1-6 Appendix A,Detailed Quantities <br /> 1.06 The following information shall be Added and Deletes from Appendix A, <br /> Detailed Quantities. Attached to this addendum is an updated Appendix A <br /> —Detailed Quantities. <br /> Location 34—Delete 35 feet of 3V from this location and Delete 67.3 of <br /> SP and Replace with 100 feet of 8" <br /> Location 35—Delete Location 35 in its entirety from the project. <br /> Location 101 —Delete 190 Wt of"" from this location and Replace with <br /> 190 feet of 15". It shall be noted that the pipe transition from an 18" <br /> CMP to a 15" CMP approx. 181 downstream of I099530. The <br /> contractor shall provide a transition liner at this location. The cost <br /> for the transition and the section of 18"liner shall be included in the <br /> price per foot for 15"liner and no additional compensation will be <br /> aid. <br /> Location 102—Delete 64.8 feet^f'''"from this location and Replace <br /> with 64.8 feet of 15" <br /> Location 105—Delete 130 feet of ^"from this location and and Replace <br /> with 130 feet of 24". It shall be noted only the south 130' section shall <br /> be lined and the City will Brovide a structure for access at the pipe <br /> transition prior to the completion of the work. <br /> Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.