Laserfiche WebLink
of the Work for conformance with the Contract Documents upon Substantial Completion,(2)results of subsequent <br /> tests and inspections,(3)correction of minor deviations from the Contract Documents prior to completion,and(4) <br /> specific qualifications expressed by the Engineer. <br /> § 3.6.3.2 The issuance of a Certificate for Payment shall not be a representation that the Engineer has(1)made <br /> exhaustive or continuous on-site inspections to check the quality or quantity of the Work,(2)reviewedconstruction <br /> means,methods,techniques,sequences or procedures,(3)reviewed copies of requisitions received from <br /> Subcontractors and suppliers and other data requested by the Owner to substantiate the Contractor's right to payment, <br /> or(4)ascertained how or for what purpose the Contractor has used money previously paid on account of the Contract <br /> Sum. <br /> § 3.6.3.3 The Engineer shall maintain a record ofthe Applications and Certificates for Payment. <br /> § 3.6.4 Submigals <br /> § 3.6.4.1 The Engineer shall review the Contractor's submittal schedule and shall not unreasonably delay or withhold <br /> approval of the schedule.The Engineer's action in reviewing submittals shall be taken in accordance with the <br /> approved submittal schedule or,in the absence of an approved submittal schedule,with reasonable promptness while <br /> allowing sufficient time,in the Engineer's professional judgment,to permit adequate review. <br /> § 3.6.4.2 The Engineer shall review and approve,or take other appropriate action upon,the Contractor's submittals <br /> such as Shop Drawings,Product Data and Samples,but only for the limited purpose of(1)checking for compliance <br /> with applicable laws,statutes,ordinances,orders,codes,rules and regulations,and(2)checking that the Work <br /> affected by and represented by such submittals is in general conformance with requirements of the Contract <br /> Documents.Review of such submittals is not for the purpose of determining the accuracy and completeness of other <br /> information such as dimensions,quantities,and installation or performance of equipment or systems,which are the <br /> Contractor's responsibility!The Engineer's review shall not constitute approval of safety precautions or construction <br /> means,methods=techniques,sequences or procedures.The Engineer's approval of a specific item shall not indicate <br /> approval of an assembly ofwhich the item is a component. <br /> § 3.6.4.3 If the Contract Documents specifically require the Contractor to provide professional design services or <br /> certifications by a design professional related to systems,materials,or equipment,the Engineer shall specify the <br /> appropriate performance and design criteria that such services must satisfy.The Engineer shall review and take <br /> appropriate action on Shop Drawings and other submittals related to the Work designed or certified by the <br /> Contractor's design professional,provided the submittals bear such professional's seal and signature when submitted <br /> to the Engineer.The Engineer's review shall be for the limited purpose of checking for conformance with information <br /> given and the design concept expressed in the Contract Documents.The Engineer shall be entitled to rely upon,and <br /> shall not be responsible for,the adequacy and accuracy of the services,certifications,and approvals performed or <br /> provided by such design professionals. <br /> § 3.6.4.4 Subject to Section 4.2,the Engineer shall review and respond to requests for information about the Contract <br /> Documents.The Engineer shall set forth,in the Contract Documents,the requirements for requests for information. <br /> Requests for information shall include,at a minimum,a detailed written statement that indicates the specific Drawings <br /> or Specifications in need of clarification and the nature of the clarification requested.The Engineer's response to such <br /> requests shall be made in writing within any time limits agreed upon,or otherwise with reasonable promptness.If <br /> appropriate,the Engineer shall prepare and issue supplemental Drawings and Specifications in response to the <br /> requests for information. <br /> § 3.6.4.5 The Engineer shall maintain a record of submittals and copies of submittals supplied by the Contractor in <br /> accordance with the requirements of the Contract Documents. <br /> § 3.6.5 Changes in the Work <br /> § 3.6.5.1 The Engineer may order minor changes in the Work that are consistent with the intent of the Contract <br /> Documents and do not involve an adjustment in the Contract Sum or an extension of the Contract Time.Subject to <br /> Section 4.2,the Engineer shall prepare Change Orders and Construction Change Directives for the Owner's approval <br /> and execution in accordance with the Contract Documents. <br /> § 3.6.5.2 The Engineer shall maintain records relative to changes in the Work. <br /> In it AIA Document 8101"-2017.Copyright a 1974,1978,1987,1997,2007 and 2017 by The American Institute of Architects.AN rights reserved.The'Am n <br /> Institute of Architects,"'°ABA,"the AIA ,and`AIA Conti Documenty are registered arks and may not be used without fission.This document was <br /> / produced by AIA software at 18;49.33 ET on 10/28/2021 under Order No.0378037672 which expires on 08/23/2022,is not resale,is licensed for one-time use 12 <br /> only,and may only be used in accordance with the AIA Contract Documents Terms of Service.To report copyright violations,e-mail ca n h# ala_ <br /> User Notes: � 9 �y �^ <br /> (1733055828) <br />