Laserfiche WebLink
Contractor modify AIA Document A201-2017,those modifications shall not affect the Engineer's services under this <br /> Agreement unless the Owner and the Engineer amend this Agreement. <br /> § 3.61.2 The Engineer,shall advise and consult with the Owner during the Construction Phase Services.The Engineer <br /> shall have authority to act on behalf of the Owner only to the extent provided in this Agreement.The Engineer shall <br /> not have control over,charge of,or responsibility for the construction means,methods,techniques,sequences or <br /> procedures,or for safety precautions and programs in connection with the Work,nor shall the Engineer be responsible <br /> for the Contractor's failure to perform the Work in accordance with the requirements ofthe Contract Documents.The <br /> Engineer shall be responsible for the Engineer's negligent acts or omissions,but shall not have control over or charge <br /> of,and shall not be responsible for,acts or omissions of the Contractor or of any other persons or entities performing <br /> Portions of the Work. <br /> § 3.6.1.3 Subject to Section 4.2 and except as provided in Section 3.6.6.5,the Engineer's responsibility to provide <br /> Construction Phase Services commences with the award of the Contract for Construction and terminates on the date <br /> the Owner issues the final Certificate for Payment. <br /> § 3.6.2 Evaluations of the Work <br /> § 3.6.2.1 The Engineer shall visit the site at intervals appropriate to the stage of construction,or as otherwise required <br /> in Section 4.2.3,to become generally familiar with the progress and quality of the portion of the Work completed,and <br /> to determine,in general,if the Work observed is being performed in a manner indicating that the Work,when fully <br /> completed,will be in accordance with the Contract Documents.However,the Engineer shall not be required to make <br /> exhaustive or continuous on-site inspections to check the quality or quantity of the Work.On the basis of the site visits, <br /> the Engineer shall keep the Owner reasonably informed abouttheprogress and quality of the portion of the Work <br /> completed,and promptly report to the Owner(1)known deviations from the Contract Documents,(2)known <br /> deviations from the most recent construction schedule submitted by the Contractor,and(3)defects and deficiencies <br /> observed in the Work. <br /> § 3.6.2.2 The Engineer shall notify the Owner and Contractor of any Work it determines does not conform to the <br /> Contract Documents.Whenever the Engineer considers it necessary or advisable,the Engineer shall have the authority <br /> to require inspection or testing of the Work in accordance with the provisions of the Contract Documents,whether or <br /> not the Work is fabricated,installed or completed.However,neither this authority of the Engineer nor a decision made <br /> in good faith°either to exercise or not to exercise such authority shall give rise to a duty or responsibility of the <br /> Engineer to the Contractor,Subcontractors,suppliers,their agents or employees,or other persons or entities <br /> performing portions of the Work. <br /> § 3.6.2.3 The Engineer shall interpret,and make a written recommendation to the Owner regarding matters concerning <br /> performance under,and requirements of,the Contract Documents on written request of either the Owner or <br /> Contractor.The Engineer's response to such requests shall be made in writing within any time limits agreed upon or <br /> otherwise with reasonable promptness. <br /> § 3.6.2.4 Interpretations and decisions of the Engineer shall be consistent with the intent of,and reasonably inferable <br /> from,the Contract Documents and shall be in writing or in the form of drawings. When making such interpretations <br /> and decisions,the Engineer shall endeavor to secure faithful performance by both Owner and Contractor,shall not <br /> show partiality to either,and shall not be liable for results of interpretations or decisions rendered in good faith.The <br /> Engineer's decisions on matters relating to aesthetic effect shall be final if consistent with the intent expressed in the <br /> Contract Documents. <br /> § 3.6.2.5 The Engineer shall render initial decisions on Claims between the Owner and Contractor as provided in the <br /> Contract Docurnents. <br /> § <br /> 3.6.3 Certificates for Payment to Contractor <br /> § <br /> 3.6.3.1 The Engineer shall review and certify the amounts due the Contractor and shall issue certificates in such <br /> amounts.The Engineer's certification for payment shall constitute a representation to the Owner,based on the <br /> Engineer's evaluation of the Work as provided in Section 3.6.2 and on the data comprising the Contractor's <br /> Application for Payment,that,to the best of the Engineer's knowledge,information and belief,the Work has <br /> progressed to the point indicated,the quality of the Work is in accordance with the Contract Documents,and that the <br /> Contractor is entitled to payment in the amount certified.The foregoing representations are subject to(1)an evaluation <br /> Init. AIA Document 8101` -2017.Copyright 01974,1978,1987,1997,2007 and 2417 by The American institute of Architects.All rights reserved.The°A ri n <br /> In i ofArchit —AIA, 8 AiA Logo,and AAA n Documents" r tra �a arad <br /> produced by AIA software at 16:49:33 ET on 10/28/2021 under Order No.0378037672 which y i This document was <br /> only,and may only be used in accordance with the AIA Contract Documents®Terms of Service.To report <br /> ©2312021 is not for resale,isYbeensed for one-time use <br /> User Notes: mP copyright violadons,e-mail copytlghtgaia.org. <br /> (1733055828) <br />