|
§ 4.1.3 if the Owner identified a Sustainable Objective in Article 1,the Engineer shall provide,as a Supplemental
<br /> Service,the Sustainability Services required in AIA Document E204Tm-2017,Sustainable Projects Exhibit,attached
<br /> to this Agreement.The Owner shall compensate the Engineer as provided in Section 11.2.
<br /> § 4.2 Engineer's Additional Services
<br /> The Engineer may provide Additional Services after execution of this Agreement without invalidating the Agreement.
<br /> Except for services required due to the fault of the Engineer,any Additional Services provided in accordance with this
<br /> Section 4.2 shall entitle the Engineer to compensation pursuant to Section 11.3 and an appropriate adjustment in the
<br /> Engineer's schedule.
<br /> § 4.2.1 Upon recognizing the need to perform the following Additional Services,the Engineer shall notiy the Owner
<br /> with reasonable promptness and explain the facts and circumstances giving rise to the need.The Engineer shall not
<br /> proceed to provide the following Additional Services until the Engineer receives the Owner's written authorization:
<br /> .1 Services necessitated by a change in the Initial Information,
<br /> the Owner,or a material change in the Project including size,quality,instructions
<br /> mp xity,the Owner'ls s
<br /> schedule
<br /> by
<br /> schedule or budget for Cost of the Work,or procurement or delivery method;
<br /> .2 Services necessitated by the enactment or revision ofcodes,laws,or regulations,including changing or
<br /> editing previously prepared Instruments of Service;
<br /> .3 Changing or editing previously prepared Instruments of Service necessitated by official interpretations
<br /> of applicable codes,laws or regulations that are either(a)contrary to specific interpretations by the
<br /> applicable authorities having jurisdiction made prior to the issuance of the building permit,or(b)
<br /> contrary to requirements of the Instruments of Service when those Instruments of Service were
<br /> prepared in accordance with the applicable standard of care;
<br /> .4 Services necessitated by decisions of the Owner not rendered in a timely manner or any other failure of
<br /> performance on the part of the Owner or the Owner's consultants or contractors;
<br /> .5 Preparing digital models or other design documentation for transmission to the Owner's consultants
<br /> and contractors,or to other Owner-authorized recipients;
<br /> .6 Preparation ofdesign and documentation for alternate bid or proposal requests proposed by the Owner;
<br /> .7 Preparation for,and attendance at,a public presentation,meeting or hearing;
<br /> .8 Preparation for,and attendance at,a dispute resolution proceeding or legal proceeding,except where
<br /> the Engineer is party thereto;
<br /> .9 Evaluation of the qualifications of entities providing bids or proposals;
<br /> .10 Consultation concerning replacement of Work resulting from fire or other cause during construction;
<br /> or,
<br /> f Al Assistance to the Initial Decision Maker,if other than the Engineer.
<br /> § 4.2.2 To avoid delay in the Construction Phase,the Engineer shall provide the following Additional Services,notify
<br /> the Owner with reasonable promptness,and explain the facts and circumstances giving rise to the need.If,upon
<br /> receipt of the;Engineer's notice,the Owner determines that all or parts of the services are not required,the Owner shall
<br /> give prompt written notice to the Engineer of the Owner's determination.The Owner shall compensate the Engineer
<br /> for the services provided prior to the Engineer's receipt of the Owner's notice.
<br /> .1 Reviewing a Contractor's submittal out of sequence from the submittal schedule approved by the
<br /> Engineer;
<br /> .2 Responding to the Contractor's requests for information that are not prepared in accordance with the
<br /> Contract Documents or where such information is available to the Contractor from a careful study and
<br /> comparison of the Contract Documents,field conditions,other Owner-provided information,
<br /> Contractor-prepared coordination drawings,or prior Project correspondence or documentation;
<br /> .3 Preparing Change Orders and Construction Change Directives that require evaluation of Contractor's
<br /> proposals and supporting data,or the preparation or revision of Instruments of Service;
<br /> ,4 Evaluating an extensive number of Claims as the Initial Decision Maker;or,
<br /> .5 Evaluating substitutions proposed by the Owner or Contractor and malting subsequent revisions to
<br /> Instruments of Service resulting therefrom.
<br /> § 4.2.8 The Engineer shall provide Construction Phase Services exceeding the limits set forth below as Additional
<br /> Services.When the limits below are reached,the Engineer shall notify the Owner:
<br /> 1 One(1)reviews of each Shop Drawing,Product Data item,sample and similar submittals of the
<br /> Contractor
<br /> In it AIA Document 8101'—2'17.Copyright O i 974,1978,1987,1997,2007 and 2017 by The American Institute of Architects.All rights reserved.The"American
<br /> Institute of A " °IAEA,°the AIA Logo,and WA Con Documents,are registered trademarks and may not be used wiftVt mission.This d�lm�tt was
<br /> produced by AIA software at 16:49:33 ET on 10/28!2421 under order No.0378037672 which expires on 08/23/2022,is not for resale,is licensed for one time use 5
<br /> only,and may only be used in accordance with the AIA Contract Documents®Terms:of Service.To report copyright violations.a-rnail copyright
<br /> User Notes:
<br /> �aia.org.
<br /> (1733055828)
<br />
|