.2 Four(4)visits to the site by the Engineer during construction
<br /> .3 Zero(0)inspections for any portion of the Work to determine whether such portion of the Work is
<br /> substantially complete in accordance with the requirements of the Contract Documents
<br /> .4 One(1)site observation trip for any portion of the Work to determine final completion and develop a
<br /> punch list
<br /> 4.2.4 Except for services required under Section 3.6.6.5 and those services that do not exceed the limits set forth in
<br /> Section 4.2.3,Construction Phase Services provided more than 60 days after(1)the date of Substantial Completion of
<br /> the Work or(2)the initial date of Substantial Completion identified in the agreement between the Owner and
<br /> Contractor,whichever is earlier,shall be compensated as Additional Services to the extent the Engineer incurs
<br /> additional cost in providing those Construction Phase Services.
<br /> § 4.2.6 If the services covered by this Agreement have not been completed within six(6)months of the date of this
<br /> Agreement,through no fault of the Engineer,extension of the Engineer's services beyond that time shall be
<br /> compensated as Additional Services.
<br /> ARTICLE 5 OWNER'S RESPONSIBILITIES
<br /> § 5.1 Unless otherwise provided for under this Agreement,the Owner shall provide information in a timely in
<br /> regarding requirements for and limitations on the Project,including a written program,which shall set forth the
<br /> Owner's objectives;schedule;constraints and criteria,including space requirements and relationships;flexibility;
<br /> expandability;special equipment;systems;and site requirements.
<br /> § 52 The Owner skull establish the Owner's budget for the Project,including(1)the budget for the Cost of the Work
<br /> as defined in Section 6.1;{2}the Owner's other costs,and,(3)reasonable contingencies related to all of these costs.oughout the duration of the Project until
<br /> The Owner shall update the Owner's budget for the Project as necessary throughout
<br /> final completion.If the Owner significantly increases or decreases the Owner's budget for the Cost of the Work,the
<br /> Owner shall notify the Engineer.The Owner and the Engineer shall thereafter agree to a corresponding change in the
<br /> Project's scope and quality.
<br /> § 5.3 The Owner shall identify a representative authorized to act on the Owner's behalf with respect to the Project.The
<br /> Owner shall render decisions and approve the Engineer's submittals in a timely manner in order to avoid unreasonable
<br /> delay in the orderly and sequential progress of the Engineer's services.
<br /> § 5.4 The Owner shall furnish surveys to describe physical characteristics,legal limitations and utility locations for the
<br /> site of the Project,and a written legal description of the site.The surveys and legal information shall include,as
<br /> applicable,grades and lines;of streets,alleys,pavements and adjoining property and structures;designated wetlands;
<br /> adjacent drainage rights-of-way,restrictions,easements,encroachments,zoning,deed restrictions,boundaries and
<br /> contours of the site;locations,dimensions,and other necessary data with respect to existing buildings,other
<br /> improvements and trees;and information concerning available utility services and lines,both public and private,
<br /> above and below grade,including inverts and depths.All the information on the survey shall be referenced to a Project
<br /> benchmark.
<br /> § 5.5 The Owner shall furnish services of geotechnical engineers,which may include test borings,test pits,
<br /> determinations of soil bearing values,percolation tests,evaluations of hazardous materials,seismic evaluation,ground
<br /> corrosion tests and resistivity tests,including necessary operations for anticipating subsoil conditions,with written
<br /> reports and appropriate recommendations.
<br /> § 5.6 The Owner shall provide the Supplemental Services designated as the Owner's responsibility in Section 4.1.1.
<br /> § 5.7 If the Owner identified a Sustainable Objective in Article 1,the Owner shall fulfill its responsibilities as required
<br /> in this Agreement.
<br /> § 5.8 The Owner shall coordinate the services of its own consultants with those services provided by the Engineer.
<br /> Upon the Engineer's request,the Owner shall famish copies of the scope of services in the contracts between the
<br /> Owner andtheOwner's consultants.The Owner shall furnish the services of consultants other than those designated as
<br /> the responsibility of the Engineer in this Agreement,or authorize the Engineer to famish them as an Additional
<br /> Service,when the Engineer requests such services and demonstrates that they are reasonably required by the scope of
<br /> Init. AIA Document 8141"-2017.Copyright 1 974 1 1 978.1987 1897,2007 and 2017 b The American Institute or Architects.All rights reserved.l rYEETMw F t
<br /> fns m"�I1�t=the A�[R a �'
<br /> rti and y not a wathart pe Icsn.This dor�ment was
<br /> prod d by Y software at 16.46:33 ET on 10/28/2021 under Order No.0378037672 which expires on 0812312022,is not for resale.'s licensed for one-time use
<br /> only,and may only be rimed in accordance with the AIA Contract Documenis®Terms of Service.Ta reportPYr+9 yiolag*a mal c+i ri
<br /> User
<br /> Mote'.
<br /> PY ght�aia:org.
<br /> (1733055828)
<br />
|