A. Engineering Basic Services—Multi Modal Facility <br /> • Provide review of existing equipment and design concept/intent <br /> • Provide equipment specification and selection to replace three existing Furnaces and Air cooled <br /> condensing units. New units to be chosen to be minimum 16-17 SEER. <br /> • Review available Ameren rebates for new equipment to determine if any are available. <br /> • Design/specify new BAS controller to provide equipment status,failure,alarm,etc.for new <br /> furnaces,CU and existing ERU units. A means to notify maintenance staff that the units need to <br /> have filters changed is highly desirable. <br /> • Design BAS local control unit to interface transit building BAS system via local ethernet/intranet. <br /> • Provide preliminary"budget"construction cost estimate <br /> B. Engineering Basic Services—Decatur Mass Transit Facility <br /> • Provide review of existing equipment and design concept/intent <br /> • Develop corrective action necessary to reestablish the original building HVAC design intent and <br /> sequence of operation of equipment and space conditions. <br /> • Provide equipment specification and selection to replace two existing air cooled condensing units. <br /> New units to be chosen to be minimum 16-17 SEER if possible. <br /> • Provide plans and specifications to repair/upgrade the existing AHU unit. <br /> • Provide equipment specification and selection for replacement water heater. <br /> • Provide equipment specification and selection to replace existing gas fired radiant heaters in repair <br /> garage areas. <br /> • Provide equipment specification and selection for new boiler hot water circulation pump and <br /> associated piping and controls. <br /> • Provide equipment specification and selection for replacement of existing gas fire boilers <br /> • Provide equipment specification and selection of new BAS control system and interface of existing <br /> equipment,boilers,hot water valves,CU,AHU and Fan VFD controllers,and all zone VAV boxes <br /> to return the building control to the original design sequence of operation and equipment control. <br /> • Provide interface with remote BAS controller to monitor equipment status from the Multi-modal <br /> facility through this new BAS front end system via ethernet/intranet. <br /> • Review available Ameren rebates for all new equipment to determine if any are available. <br /> • Provide a final Punch list of all installed items and review final test and balance reports.(This is the <br /> only construction phase service to be included in this fixed proposal) <br /> • Provide preliminary"budget"construction cost estimate <br /> C. Procurement Phase Basic Services <br /> • Provide assistance in obtaining either competitive bids or negotiated proposals; <br /> • Provide assistance in reviewing and analyzing contractor bids to confirm proposals are providing <br /> equipment,and material that meet the compliance requirements of the plans and specifications. <br /> • Provide recommendation of which bid to accept to the city of Decatur <br /> • All other Bidding phase services not specifically listed above have been excluded from this <br /> proposal,including but not limited to the following: <br /> a. Assistance to the Owner in confirming responsiveness of bids or proposals <br /> b. Assistance to the Owner in awarding and preparing contracts for construction. <br /> D. Construction Phase Basic Services <br /> Review and check equipment shop drawings and submittals <br /> • Assist the owner in response to contractor questions or requests for information(RFI)and provide <br /> appropriate responses and answers <br /> Provide coordination and clarifications with the contractor that may arise during the construction <br /> process <br /> • Provide up to four(4)site observation visits to the site to review construction progress and to <br /> confirm that the construction is meeting the general intent of the project plans and specifications. <br /> !nit AIA Document B7o1--20 i 7.Copyright 0 1974,1978,1987,1997,2007 and 2017 by The American Institute of Architects_All rights reserved.The"American <br /> Institute of Architects,'"AIA,"tt AiA Logo,and"AIA ConicDocuments"are registered trademarks and may not be used without permission.This document was <br /> f produced by AIA software at 16.49.33 ET on 10/28/2021 under Order No.0378037672 which expires on 08/2312022,is not for resale,is licensed for one-time use <br /> only,and may only be used in accordance with the AIA Contract Documents•Terms of Service.To report copyright violations,e-mail copynghf{c�aia.org. <br /> User Notes: <br /> (1733055828) <br />