Laserfiche WebLink
Section 16905 — Systems REPLACE Item D.1. in its entirety with "Same as South <br /> 10 Integration Claricone using series 200 numbers but remove LIT <br /> Page 6 131-and Add FIT-022 (24" Mag Meter indicating flow to <br /> North Claricone." <br /> Section 16905—Systems ADD Item F.4. as follows, "PH (AIT-201) shall monitor <br /> 11 Integration the PH level of the effluent of the effluent of North <br /> Page 7 Claricone. The SCADA system shall indicate the PH <br /> level of the water." <br /> ADD Item G.3. as follows, "FE-501: The flow totalizer <br /> Section 16905 — Systems will indicate the amount of flow from the plant water <br /> 12 Integration system to the Alum Chemical Feed System. The <br /> Page 7 SCADA system shall indicate the amount of flow of the <br /> associated plant water and totalize." <br /> Section 15272 —Valves for If the rectangular plug valve supplied is 100% open at <br /> 13 Actuator Control full port, they will be acceptable in lieu of the round port <br /> Page 14, Clarification plug valves specified. <br /> Drawing S-304 - SCC — REVISE call outs for#5 rebar at 9" spacing to#5 rebar <br /> 14 SECTIONS AND DETAILS at 12" spacing as noted on sheet S-111 SCC — <br /> III, Detail A5 TROUGH SLAB PLAN. <br /> Drawing DI-604—ALUM ADD between the Alum Chemical Feed pumps and <br /> 15 CHEMICAL FEED SCC1-C a box to indicate "Alum Chemical Feed Control <br /> SYSTEM Panel' for local control of chemical feed pumps per <br /> specification Section 11241. <br /> Drawing D-107 — NORTH INSERT pipe nomenclature#15 call out where the <br /> 16 SCC WATER JET AND existing 36" steel pipe connects to the proposed 36" <br /> INFLUENT PIPING flanged ductile iron pipe. <br /> Detail Al <br /> Drawing D-107 — NORTH For pipe nomenclature#15, a welded steel flange or <br /> 17 SCC WATER JET AND flanged coupling adaptor as required for construction is <br /> INFLUENT PIPING acceptable in these two locations. A restrained flange <br /> Clarification coupling adaptor is not required. <br /> Drawing D-109 — NORTH REVISE the pipe nomenclature#5 just above and to <br /> 18 SCC DEWATERING the right of the pump to pipe nomenclature#9. HV-204 <br /> PUMP- PLAN, SECTION & is noted incorrectly it is an 8" KGV. <br /> DETAILS, Detail A4 <br /> Drawing D-605 —VALVE REVISE End Type from Flanged to Lug Wafer (LW) for <br /> 19 AND ACTUATOR all South and North dewatering pump knife gate valves. <br /> SCHEDULE II <br /> REVISE Key Note number 3 to read, "Provide 3 <br /> Drawing E-105 — #10THWN (480VAC, 3 Phase), 1 #10 Ground from <br /> 20 CHEMICAL FEED AREA Alum Control Panel to MCCA as indicated on Sheet E- <br /> ELECTRICAL 602. In addition, provide 480VAC power from Alum <br /> Control Panel to Alum Chem Feed Pump Skid." <br /> END OF ADDENDUM NUMBER 03 <br /> Decatur WTF/16011-01 2 of 2 Addendum No. 03 <br />