My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2021-236 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Plocher Construction Inc. for Clarifier Conversion Project City Project 2016-03
COD
>
City Clerk
>
RESOLUTIONS
>
2021
>
R2021-236 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Plocher Construction Inc. for Clarifier Conversion Project City Project 2016-03
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2023 4:24:42 PM
Creation date
12/21/2021 4:39:20 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2021-236
Res Ord Title
R2021-236 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Plocher Construction Inc. for Clarifier Conversion Project City Project 2016-03
Department
Public Works
Approved Date
12/20/2021
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
683
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C M T <br /> MEMORANDUM OF MEETING MINUTES <br /> Date Issued: <br /> November 8, 2021 <br /> PROJECT: City of Decatur 2016-03 <br /> Clarifier Conversion Project <br /> CMT Project Number 21001804-00 <br /> SUBJECT: Pre-Bid Meeting <br /> MEETING DATE: Wednesday, November 3, 2021 <br /> MEETING TIME: 9:30 a.m. CST <br /> rLOCATION: South Water Treatment Plant <br /> 1155 South Martin Luther King Jr. Drive <br /> Decatur, Illinois 62521 <br /> ATTENDEES: See Attached Attendance Record (3 pages) <br /> I. Introductions. <br /> The meeting began with introductions of City of Decatur Representatives Matt Newell, <br /> Director of Public Works, Paul Caswell, City Engineer and Keith Alexander, Water <br /> Production Manager, Chaundra Smith, Water Production Operations Supervisor and <br /> Randy Weaver, Water Production Maintenance Supervisor, as well as Ty Besalke, <br /> Water Group Manager, Jeff Large, Lead Structural Engineer, Lane Rumple, Water <br /> Resources Engineer and Amanda Withers, Project Engineer/Manager from the <br /> consulting engineering firm of Crawford, Murphy & Tilly (CMT). <br /> I. Bids Will Be Opened Friday, December 3, 2021, at 11:30 a.m. CDT. <br /> II. Bidding Requirements discussion included the background of the project and an <br /> overview of the design including discussion of the following items. <br /> The City and CMT noted the following items to the attendees: <br /> • The Pre-Bid Meeting Minutes and Attendance List will be issued as a part of <br /> Addendum Number 1. <br />
The URL can be used to link to this page
Your browser does not support the video tag.