My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2022-13 Resolution Authorizing an Engineering Services Agreement with WHKS and Co. and Appropriating Rebuild Illinois (RBI) Funds for the Grove Road Bridge over Sand Creek Arm of Lake Decatur, SN 058-6010, City Project 2019-34
COD
>
City Clerk
>
RESOLUTIONS
>
2022
>
R2022-13 Resolution Authorizing an Engineering Services Agreement with WHKS and Co. and Appropriating Rebuild Illinois (RBI) Funds for the Grove Road Bridge over Sand Creek Arm of Lake Decatur, SN 058-6010, City Project 2019-34
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/20/2022 2:46:12 PM
Creation date
1/20/2022 2:46:08 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2022-13
Res Ord Title
R2022-13 Resolution Authorizing an Engineering Services Agreement with WHKS and Co. and Appropriating Rebuild Illinois (RBI) Funds for the Grove Road Bridge over Sand Creek Arm of Lake Decatur, SN 058-6010, City Project 2019-34
Department
Public Works
Approved Date
1/18/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
whiks <br /> w,: engineers+planners+land surveyors <br /> MEMORANDUM (EXHIBIT H) <br /> TO: Paul Caswell, City of Decatur—City Engineer <br /> FROM WHKS- Cory Chamberlain — Project Manager <br /> DATE: November 30, 2021 <br /> RE: Grove Road Bridge Replacement - Scope of Work <br /> Included in Scope: <br /> • Meetings-Assume any meetings are virtual and public involvement is online. <br /> • Topo Survey by SKS (Topo Limits 500' west of bridge to PE on south and 750' east to <br /> Sandcreek Drive. <br /> • Soil Borings by SKS (3 borings assumed with traffic control provided by City via closure) <br /> • Assume complete closure. Detour Analysis only for PDR/Final Plans. <br /> • Assume 3-span, PPC Deck beam structure with bituminous wearing surface based on <br /> replacement structure in BCR. Maintain both existing low beam and profile grade (if <br /> possible). No reduction in vertical clearance from water. <br /> • Assume rural section without shared-use path and without curb/gutter required. <br /> Not Included in Scope: <br /> • No ROW Plats or Easements are assumed based on existing ROW limits. <br /> • Storm sewer or curb/gutter. <br /> • NBIS or Special Feature Inspections. <br /> • Construction Phase including shop drawings. <br /> • City's Capital Improvement Construction Contract - State Let use typical IDOT <br /> specifications. <br /> • Plan distribution, Biding assistance, tabulation of bids or award recommendation since <br /> project will be State let. <br /> • Traffic control or bridge plans for staged traffic. (Complete Road Closure Assumed) <br /> • Traffic Management Analysis (TMA). <br /> Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.