Laserfiche WebLink
whiks <br /> w,: engineers+planners+land surveyors <br /> MEMORANDUM (EXHIBIT H) <br /> TO: Paul Caswell, City of Decatur—City Engineer <br /> FROM WHKS- Cory Chamberlain — Project Manager <br /> DATE: November 30, 2021 <br /> RE: Grove Road Bridge Replacement - Scope of Work <br /> Included in Scope: <br /> • Meetings-Assume any meetings are virtual and public involvement is online. <br /> • Topo Survey by SKS (Topo Limits 500' west of bridge to PE on south and 750' east to <br /> Sandcreek Drive. <br /> • Soil Borings by SKS (3 borings assumed with traffic control provided by City via closure) <br /> • Assume complete closure. Detour Analysis only for PDR/Final Plans. <br /> • Assume 3-span, PPC Deck beam structure with bituminous wearing surface based on <br /> replacement structure in BCR. Maintain both existing low beam and profile grade (if <br /> possible). No reduction in vertical clearance from water. <br /> • Assume rural section without shared-use path and without curb/gutter required. <br /> Not Included in Scope: <br /> • No ROW Plats or Easements are assumed based on existing ROW limits. <br /> • Storm sewer or curb/gutter. <br /> • NBIS or Special Feature Inspections. <br /> • Construction Phase including shop drawings. <br /> • City's Capital Improvement Construction Contract - State Let use typical IDOT <br /> specifications. <br /> • Plan distribution, Biding assistance, tabulation of bids or award recommendation since <br /> project will be State let. <br /> • Traffic control or bridge plans for staged traffic. (Complete Road Closure Assumed) <br /> • Traffic Management Analysis (TMA). <br /> Page 1 of 2 <br />