Laserfiche WebLink
whks <br /> engineers+planners+land surveyors <br /> Not Included in Scope (continued) <br /> • Shared-use path, Sidewalks or Safe Route to schools. (Assume bridge width is widened <br /> if necessary to satisfy requirements for pedestrian or bicycle traffic). <br /> • Relocation/Design of utilities including overhead street lighting, water, storm or sanitary <br /> sewer, gas, electric, etc. <br /> • Context Sensitive Solution (CSS). <br /> • Updating BCR prepared by another consultant. <br /> • No TSL (Preliminary Bridge Design and Hydraulic Report instead) <br /> • Direct cost related to facilities for public meeting. <br /> • Direct cost for advertising public meeting. <br /> • Direct cost for postage for public information mailers. <br /> • Direct cost for IDNR Permit($2740 for bridge crossing, add$1650 if public notice required) <br /> Page 2 of 2 <br />