Exhibit A <br /> Vulcan Pit Improvements, Rhodes Landfill Review <br /> and Source Water Protection Plan, City Project 2022-22 <br /> Task 1. Former Vulcan Pit <br /> Improvements to facilitate the use of the former Vulcan Pit (Pit) as a raw water source were <br /> recommended in INTERA's 2019 Alternative Water Supply Report (Report) to the City. INTERA <br /> will perform the following tasks to assess the available water quantity and to design, permit, <br /> and bid the construction of the recommended infrastructure improvements. <br /> Task 1a— Water Quantity Assessment <br /> The amount of water available from the former Vulcan Pit will be calculated with a new <br /> bathymetric survey and a recharge estimate.As 22 years have passed since the last survey of <br /> the Pit(Bainbridge-Gee-Milanski and Associates,2000), INTERA will subcontract with Aquatic <br /> Control (Canton, IL) to perform a modern, digital bathymetry survey. This data will be used <br /> to develop a new volumetric model of the Pit. <br /> INTERA will also estimate groundwater recharge to the Vulcan Pit. To aid in doing so, a <br /> stilling well will be installed in the Pit and instrumented to track changes in the water <br /> elevation in the Pit. The record of the Pit stages will be correlated with river elevation data <br /> collected by the U.S. Geological Survey just downstream at the U.S. Route 48 river crossing. <br /> These data, along with hydrologic calculations, will assist in an evaluation of groundwater <br /> recharge to the Pit. <br /> Both the bathymetric survey and the recharge study will be used to evaluate the volume of <br /> potential short-term drought supply that can be obtained from the Vulcan Pit. <br /> Task 2b—Engineering Design <br /> As described in the 2019 Report, INTERA will prepare engineering design plans and technical <br /> specifications for use in permitting, bidding, and constructing approximately 3,000 feet of <br /> 14-inch pipeline from the Pit to the raw water intake pipeline. The project includes a <br /> horizontal directionally installed river crossing and pump, electrical, and control <br /> improvements for operation of the system.This task will not begin until after an assessment <br /> of Pit volume is available from the bathymetry conducted in Task 1a. The construction cost <br /> was estimated to be approximately$1 million (INTERA, 2019). This estimate is not based on <br /> design and includes contingencies. A more refined construction cost estimate will be <br /> provided at the 60% design stage. With this estimate the City can confirm its intent to <br /> proceed. <br /> Last Revised;4/4/2022 <br />