My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2022-73 Resolution Authorizing a Professional Engineering Services Agreement with INTERA Inc. for Vulcan Pit, Rhodes Landfill and Source Water Protection Plan, City Project 2022-22
COD
>
City Clerk
>
RESOLUTIONS
>
2022
>
R2022-73 Resolution Authorizing a Professional Engineering Services Agreement with INTERA Inc. for Vulcan Pit, Rhodes Landfill and Source Water Protection Plan, City Project 2022-22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/4/2022 4:49:38 PM
Creation date
5/4/2022 4:49:34 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2022-73
Res Ord Title
R2022-73 Resolution Authorizing a Professional Engineering Services Agreement with INTERA Inc. for Vulcan Pit, Rhodes Landfill and Source Water Protection Plan, City Project 2022-22
Department
Public Works
Approved Date
5/2/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
33
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
reflect possible Landfill impacts of concern to water quality in Lake Toko. Historical <br /> groundwater monitoring parameters will be evaluated to identify any gaps in these <br /> parameters relative to potential waste constituents. The physical characteristics of the <br /> Landfill (e.g., the presence or absence of a cover and, if present, the makeup of the cover) <br /> will also be considered in assessing potential risks. A sampling plan to gather additional <br /> groundwater and surface water quality data will be included, should our assessment suggest <br /> further data gathering can reduce the risk to the City. <br /> Task A—Legal Liaison Contingency <br /> Should the qualitative assessment of the risks to the City appear favorable, INTERA will liaise <br /> with the City's legal counsel or their chosen legal representative to relay the information <br /> found during the review completed in Task 2a.As requested by the City,this will be reserved <br /> as a contingency to this proposal at a cost of$15,000. <br /> Task 3. Technical Memoranda and Presentation of Results <br /> The water quantity assessment of the former Vulcan Pit and the Rhodes Landfill risk assessment <br /> will be summarized in two technical memoranda containing methods, results, and <br /> recommendations. INTERA will also meet with the City to discuss our findings.As discussed,the <br /> Pit assessment will also be included as an Appendix in the engineering report. <br /> Task 4. Source Water Protection Plan <br /> The City has much of the required SWP elements located in various reports. A vision statement <br /> is needed and will be created in concert with City officials. INTERA will compile the required <br /> information and assemble into a format addressing each of the elements set out by the ILEPA <br /> SWP criteria.To comply with the ILEPA,this must be submitted to ILEPA for approval by July 26, <br /> 2022. <br /> 4 <br /> Last Revised:4/4/2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.