My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2022-77 Resolution to Appropriate Motor Fuel Tax Funds for Restoration of Streets and Highways by Municipality under the Illinois Highway Code, City Project 2022-11, Concrete
COD
>
City Clerk
>
RESOLUTIONS
>
2022
>
R2022-77 Resolution to Appropriate Motor Fuel Tax Funds for Restoration of Streets and Highways by Municipality under the Illinois Highway Code, City Project 2022-11, Concrete
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2023 5:07:44 PM
Creation date
5/4/2022 4:53:23 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2022-77
Res Ord Title
R2022-77 Resolution to Appropriate Motor Fuel Tax Funds for Restoration of Streets and Highways by Municipality under the Illinois Highway Code, City Project 2022-11, Concrete
Department
Public Works
Approved Date
5/2/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4/26/22,2:10 PM Item Coversheet <br /> E.CANTRELL MLK Jr Dr JASPER ST Mill&Overlay 2,528 0.96 <br /> ST <br /> N. OAKLAND ELDORADO LEAFLAND AVE Mill&Overlay 2,485 0.94 <br /> AVE ST <br /> W.RATTAN N.TAYLOR END OF STREET Asphalt Patches 67 0.01 <br /> AVE AVE <br /> N.LOURDES W. MOUND SOUTHAMPTON Asphalt Patches 98 0.04 <br /> DR RD <br /> WILDWOOD E. GROVE FENWAY DR Mill&Overlay 567 0.21 <br /> DR RD <br /> E.CHESTNUT 35th ST 36th ST Street Widening 445 0.08 <br /> DR <br /> E.PERSHING 275 E 303 E PERSHING Asphalt Patch 67 0.03 <br /> RD PERSHING <br /> Total Length 12,818 4.6 <br /> 2022 Concrete and Brick Street Rehabilitation Project 2022-11 <br /> The second resolution appropriates$650,000 in State MFT funds for concrete and brick street work for the proposed 2022 <br /> Concrete Street Rehabilitation project,City Projec 2022-11. The Concrete Street project is being prepared as a separate project <br /> from the annual Street Restoration project,becau f the amount of concrete street patches being proposed this year.The 2022-11 <br /> project will perform concrete patching work on three streets. <br /> The proposed locations for concrete patching is as follows(see attached location map): <br /> Location Treatment Length of Length <br /> Street road(feet) (Lane Miles) <br /> N.27th Street S S Route 36 to E.William Concrete Patches 2,840 1.08 <br /> E.William Street 27"St.to Illinois Route Concrete Patches 496 0.19 <br /> 105 <br /> N.Jasper Street E.Grand Ave.to E. Concrete Patches 2,431 1.84 <br /> Garfield Ave. <br /> Total Length 5,767 3.11 <br /> SCHEDULE: <br /> Design work for the 2022 Street Restoration Project and 2022 Concrete Street Rehab Project is underway.Both projects are <br /> planned to begin in the month of July. <br /> PRIOR COUNCIL ACTION: None <br /> POTENTIAL OBJECTIONS: There are no known objections to this resolution. <br /> INPUT FROM OTHER SOURCES: <br /> Illinois Department of Transportation <br /> LEGAL REVIEW: Legal review of the State Motor Fuel Tax appropriation is not required. <br /> STAFF REFERENCE: Matt Newell,Public Works Director,Paul Caswell,City Engineer and Griffin Enyart,Assistant City <br /> Engineer. Matt Newell will be in attendance at the City Council meeting to answer any questions of the Council on this item. <br /> BUDGET/TIME IMPLICATIONS: <br /> 1. Budget Impact: The two proposed resolutions appropriate a total of$2,300,000 in State Motor Fuel Tax funds for street <br /> projects. The State Motor Fuel Tax increase in 2019 increased State MFT revenues to the City by approximately$1.3 million a <br /> year to around$3.2 million. <br /> https://decatur.novusagenda.com/AgendaWeb/CoverSheet.aspx?ltemID=3890 2/3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.