Laserfiche WebLink
bran J,RON Service Deiivery <br /> ----------- <br /> g-g <br /> 0 <br /> r r-- 405 w g IF ,n <br /> , <br /> Term k 77 <br /> CCU ChoiceConnect Fixed Network Collector,also referred to as a Network Device. <br /> Functional Testing Testing completed by ITRON anytime Licensed Software is installed and/or configured during <br /> the Project.Basic functional tests are performed to verify component operation. <br /> Go-Live Go-Live is the transition from a Test system to a Production system. <br /> Interface Integration point between two components within the CUSTOMER System that has an agreed <br /> format to exchange information or complete a transaction. This is commonly a web service or <br /> batch file and typically is implemented between an ITRON and non-ITRON component of the <br /> System. <br /> Interface Assessment Conducted by ITRON,the Interface Assessment includes an evaluation and training to refresh <br /> the CUSTOMER on the process and check that the interfaces and file management are <br /> running as expected. <br /> Master Data Import(MDI) Master Data Import. An XML file format that contains data specific to Endpoint installation <br /> locations,account information,and service point specific data.ITRON provides the format and <br /> content,and CUSTOMER produces the actual MDI file. <br /> Network Device Network Devices include CCUs and repeaters already installed at CUSTOMER location. <br /> Project Team CUSTOMER,CUSTOMER partners,ITRON and ITRON partners who are stakeholders <br /> vested in the delivery of a successful Project. <br /> Stabilization Period Five(5)day period when CUSTOMER successfully operates new CCFN System while <br /> Production environment is running before transition to ITRON Support Services takes place. <br /> System Cutover Cutover from old(current)CCFN system to new CCFN System(occurs as part of Go-Live <br /> activities). <br /> Statement of Work—City of Decatur,IL Confidential Page 4 of 22 <br />