Laserfiche WebLink
WWW L E Y <br /> NTERIORS <br /> :^301 G i_lL LIRGL aT j SPRINGFE',LO, IL 627015 <br /> .P..17,54 A.2.766 1 www.wileyinteriors.corn <br /> July 6, 2022 <br /> Decatur Civic Center <br /> Mike Pritchett, Decatur Civic Center <br /> Greg Crowe, Planning & Development Manager, David Greenwell, Building Inspection Manager <br /> Project: Quote for New Offices and Reconfiguration of Existing Workstations, Update #2 <br /> The following quote is for: <br /> • New furniture in the offices using Premiera PL <br /> • New Action Office workstation items as designated by David in his drawing <br /> • New item delivery and installation labor at prevailing wage scale <br /> • Reconfiguration of existing workstations at prevailing wage scale <br /> Drawing and item list is attached. If the work does not need to be done on the prevailing wage scale, <br /> then I can update the quote to reflect standard rates. <br /> PROJECT SUMMARY <br /> FURNITURE $ 42,707.11 <br /> TEARDOWN/RE-INSTALL EXISTING STATIONS $ 7,560.00 <br /> DELIVERY/INSTALLATION: NEW ITEMS $ 5,880.00 <br /> PROJECT TOTAL $ 56,147.11 <br /> POWER/DATA <br /> Quoted items include power entries, power harnesses in panels with a "G" suffix on the drawing, and <br /> duplex electrical receptacles for the workstations. Quote does not include any data cabling or com- <br /> munications/data ports in the workstations. The panels with a "G" suffix have a knockout where your <br /> IT vendor can place a communications/data port. <br /> Power for the workstations adjacent to walls comes from base power entries that connect to building <br /> power through wall outlets. The four workstations in the back area that are not next to a wall are <br /> powered through a power pole, with the connection to building power in the ceiling. The intake station <br /> and large office are powered from wall outlets. <br /> You will need an electrician to connect the supplied power entries to building power. Once the elec- <br /> trician has connected the power entry, my installers can connect the rest of the power components in <br /> the panels. Your IT staff or vendor will need to supply and run data cabling along with data ports. My <br /> installers can coordinate with the electrician and data vendors during installation. <br />