My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2022-112 Resolution Authorizing a Professional Engineering Services Agreement with Crawford, Murphy, Tilly to Provide Final Design Engineering Services for the South Water Treatment Plant Upgrades, Chemical Systems, City Project 2022-02
COD
>
City Clerk
>
RESOLUTIONS
>
2022
>
R2022-112 Resolution Authorizing a Professional Engineering Services Agreement with Crawford, Murphy, Tilly to Provide Final Design Engineering Services for the South Water Treatment Plant Upgrades, Chemical Systems, City Project 2022-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2022 2:45:36 PM
Creation date
7/19/2022 2:45:32 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2022-112
Res Ord Title
R2022-112 Resolution Authorizing a Professional Engineering Services Agreement with Crawford, Murphy, Tilly to Provide Final Design Engineering Services for the South Water Treatment Plant Upgrades, Chemical Systems, City Project 2022-02
Department
Public Works
Approved Date
7/18/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT 2 —WILLIAM STREET BOOSTER STATION IMPROVEMENTS <br /> William Street Booster Station Description of Work <br /> • Replace three (3) pump control valves on upper level. <br /> • Replace one (1)fill valve on lower level. <br /> • Roof repair/replacement <br /> • New sky lights (3 fixed and 3 to open to remove pumps) <br /> • Revamp HVAC. New heating system needed (natural gas fueled) <br /> • Conduct Preventative Maintenance for MCC <br /> • Conduct asbestos testing for pipe insulation only. If needed, asbestos removal. <br /> • New flow meter/vault <br /> The Engineering Design Phase Scope of Services for the William Street Booster Station <br /> Improvements shall consist of the following tasks: <br /> 1. Review existing background information. Compile and review existing operations <br /> information, chemical usage data, drawings and other information as required to <br /> understand operations and prepare for the site visit and kickoff meeting. <br /> 2. Site Visit/Project Kickoff Meeting. Conduct a site visit and project kickoff meeting at <br /> the water treatment plant with project team members and City personnel to review and <br /> discuss the project scope and collect field data. Items to be discussed at project kickoff <br /> meeting include project goals, schedule, construction sequencing/phasing and keeping <br /> the plant operational for the duration of the project. <br /> 3. Prepare 30% Design Documents. Prepare preliminary drawings including Floor Plan, <br /> Process Equipment, Electrical One Line Diagram and Process & Instrumentation <br /> Diagrams. Develop a list of specifications that will be required. Prepare an Opinion of <br /> Probable Construction Cost (OPCC). Submit design documents to City in advance of <br /> progress meeting for review. <br /> 4. 30% Design Review Meeting. This meeting will be conducted at the water treatment <br /> plant to discuss the design documents to date and the OPCC. The City's review <br /> comments will be addressed in additional to any known critical items. At this meeting the <br /> OPCC will be discussed and any work to be eliminated or developed as an alternate bid <br /> will be discussed in an effort to stay within the construction budget. <br /> 5. Prepare List of Scope Items to Be Eliminated or Alternate Bid Items. For <br /> confirmation of the scope items to be eliminated or bid as alternate bid items CMT shall <br /> prepare a memo to document the decisions made at the 30% design review meeting for <br /> concurrence with all team members. <br /> 6. Prepare 60% Design Documents. Prepare preliminary drawings and specifications <br /> progressing from the 30% design level to the 60% design level incorporating the City's <br /> comments from the 30% design documents. preliminary specifications. Prepare an <br /> Opinion of Probable Construction Cost(OPCC). Submit design documents to City in <br /> advance of progress meeting for review. <br /> 3 <br /> Exhibit A—Scope of Work <br /> City of Decatur <br /> South Water Treatment Plant Upgrades <br />
The URL can be used to link to this page
Your browser does not support the video tag.