My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2022-112 Resolution Authorizing a Professional Engineering Services Agreement with Crawford, Murphy, Tilly to Provide Final Design Engineering Services for the South Water Treatment Plant Upgrades, Chemical Systems, City Project 2022-02
COD
>
City Clerk
>
RESOLUTIONS
>
2022
>
R2022-112 Resolution Authorizing a Professional Engineering Services Agreement with Crawford, Murphy, Tilly to Provide Final Design Engineering Services for the South Water Treatment Plant Upgrades, Chemical Systems, City Project 2022-02
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/19/2022 2:45:36 PM
Creation date
7/19/2022 2:45:32 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2022-112
Res Ord Title
R2022-112 Resolution Authorizing a Professional Engineering Services Agreement with Crawford, Murphy, Tilly to Provide Final Design Engineering Services for the South Water Treatment Plant Upgrades, Chemical Systems, City Project 2022-02
Department
Public Works
Approved Date
7/18/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. Equipment Vendor Presentations. Organize, schedule and lead equipment vendor <br /> presentations to be conducted either virtually or at the water treatment plant, depending <br /> upon staff schedules and availability. <br /> 5. Evaluate Equipment Vendors. Prepare evaluation criteria and compare vendor <br /> equipment capabilities. Prepare draft technical memo for City review. <br /> 6. Technical Memo Review Meeting. Meet to discuss draft technical memo and discuss <br /> pros and cons of various vendors. Determine which vendors will be specified and <br /> finalize technical memo. <br /> 7. Prepare 90% Design Documents. Prepare preliminary drawings and specifications <br /> progressing from preliminary discussions from the Technical Memo Review Meeting to <br /> the 90% design level. Prepare an Opinion of Probable Construction Cost (OPCC). <br /> Submit design documents to City in advance of progress meeting for review. <br /> 8. 90% Design Review Meeting. This meeting will be conducted at the water treatment <br /> plant to discuss the design documents to date and the OPCC. The City's review <br /> comments will be addressed in additional to any known critical items. At this meeting the <br /> OPCC will be discussed along with other items required prior to finalizing the design <br /> documents for permitting and bidding. <br /> 9. Prepare Final Design Documents. Incorporate City review comments and finalize <br /> plans, specifications and OPCC as required for permit acquisition and bidding. <br /> 10. Permitting. Prepare TEPA construction permit application and Engineer's Design <br /> Summary for submittal to IEPA for a construction permit. City shall obtain the operating <br /> permit(s) upon startup of the new system improvements. <br /> 11. QA/QC Review. Provide review of calculations, plans and specifications for quality <br /> control. <br /> 12. Project Management. Provide coordination and correspondence between the engineer <br /> and City staff and regulatory agency. <br /> Not Included in Scope of Services <br /> Bidding Phase Services <br /> Bulk Water Dispensing Station Improvements Design Engineering Fee $69,520 <br /> 2 <br /> Exhibit A—Scope of Work <br /> City of Decatur <br /> South Water Treatment Plant Upgrades <br />
The URL can be used to link to this page
Your browser does not support the video tag.