EXHIBIT A <br /> BURNS&MGDONNELL_ <br /> SCOPE OF SERVICES <br /> TASK 1: KICK-OFF MEETING,INITIAL DATA GATHERING AND COORDINATION <br /> BMcD will have an in-person kick-off meeting to start the project and address communication <br /> procedures, confirm the overall project scope, and discuss critical path items. After the kick-off meeting, <br /> BMcD will review the existing CCTV data provided by the City to identify gaps,missing information and <br /> any other additional data that will be required to execute the project. BMcD will coordinate with the <br /> City's current CCTV Contractor for them to provide the missing CCTV inspection information. BMcD <br /> will provide up to three(3)additional days of on-site field work to assist the City's CCTV Contractor in <br /> obtaining missing CCTV information. After the existing and new data has been reviewed, BMcD will <br /> evaluate whether sewer cleaning is required and provide any required cleaning locations to the City. It is <br /> assumed that a separate clean and CCTV project will be bid by the City,if needed. If a separate cleaning <br /> contract is required(to be performed by others), BMcD assumes that a substantial portion(80%or more) <br /> of the existing CCTV data will still be available for review and can be reviewed concurrently(see Task 3) <br /> with the cleaning project. However,cleaning will only be recommended if BMcD believes there are pipe <br /> segments that may not need to be rehabilitated. <br /> Deliverables: <br /> Kick-off Meeting Agenda and Meeting Minutes <br /> Technical Memo(Additional Data Required) <br /> Technical Memo(Sewer Cleaning Required) <br /> TASK 2: MANHOLE CONDITION ASSESSMENT <br /> BMcD will review, document, and summarize all findings related to deficiencies and existing conditions <br /> of all manhole components(frame, cover,chimney,cone,wall,rungs,bench, channel, etc.).Up to a <br /> maximum of 85 manholes will be opened and visually inspected with pole cameras that will be used to <br /> assist in documenting the condition of the manholes within the project area without having to perform <br /> confined space entry. BMcD owned tablets will also be used to track the manhole assessment data,which <br /> can easily be formatted to upload into the City's existing GIS system. <br /> Manhole location, condition of all components,debris or other obstacles, invert measurement, cover and <br /> barrel diameter, and number and direction of influent/effluent pipes will all be identified. All condition <br /> assessment work will be performed in accordance with NASSCO MACP standards. <br /> In addition,up to a maximum of 15 catch basins and/or inlets in the downtown area will also be assessed <br /> in the same manner as the manholes and in accordance with NASSCO MACP standards. These will be <br /> utilized to assist in the development of recommendations for addressing odor mitigation. <br /> It is assumed that the City(or a City Contractor) is able to provide on-site, full-time assistance with traffic <br /> control(i.e. municipal car/truck with flashing lights) for structure assessment in difficult locations (e.g. <br /> Illinois DOT roadways). It is assumed that BMcD will provide traffic control measures at all other <br /> locations with assistance from a full-time technician to be provided by the City. BMcD has allotted ten <br /> (10)working days for the field work outlined above. BMcD will provide one(1)inspector(NAASCO <br /> certified)for the manhole, catch basin,and inlet condition assessment. The assessment results of this <br /> condition assessment will be made available prior to the Report(see Task 5)in order to help facilitate any <br /> improvements(e.g. catch basin and/or inlet replacement, etc.)the City may wish to perform to mitigate <br /> odor issues associated with the sewer in the downtown area. <br /> 200 W.Adams Street\Suite 2700\Chicago, IL 60606 A_2 <br /> 0 630-724-3200\F 312-223-0920\burnsmcd.com <br />