My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2022-128 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Dunn Company, A Division of Tyrolt, Inc., for Annual Street Restoration Project, City Project 2022-08
COD
>
City Clerk
>
RESOLUTIONS
>
2022
>
R2022-128 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Dunn Company, A Division of Tyrolt, Inc., for Annual Street Restoration Project, City Project 2022-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2023 5:05:15 PM
Creation date
8/16/2022 4:27:07 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2022-128
Res Ord Title
R2022-128 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Dunn Company, A Division of Tyrolt, Inc., for Annual Street Restoration Project, City Project 2022-08
Department
Public Works
Approved Date
8/15/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPECIAL PROVISIONS <br /> SP 16 SIDEWALK WALL <br /> This work will consist of the construction of a SIDEWALK WALL at the areas and to the grades <br /> shown in the plans and details. This work shall be in accordance with the applicable portions of Cit <br /> p pp p Y <br /> Standard#1030 and Section 503 and 508 of the IDOT Standard Specifications. <br /> Basis of Payment: All labor and materials necessary to comply with this special provision <br /> will be paid for at the contract unit price per FOOT for SIDEWALK WALL and no additional <br /> ' compensation shall be provided. <br /> ' SP 17 AGGREGATE BASE COURSE SPECIAL <br /> This work will consist of the construction of a compacted CA-6 base course at the locations, <br /> thickness and grades shown in the plans and details. This work shall be in accordance with the <br /> applicable portions of Section 351 of the IDOT Standard Specifications. <br /> Basis of Payment: All labor and materials necessary to comply with this special provision <br /> will be paid for at the contract unit price per TON for AGGREGATE BASE COURSE SPECIAL <br /> and no additional compensation shall be provided. <br /> SP-18 CONNECTION TO EXISTING STRUCTURE <br /> Description: This work will consist of providing all labor, equipment, tools, materials, <br /> transportation, services, and technical competence required to connect a proposed sewer to an <br /> existing structure as detailed on the plans or notified by the Engineer. The existing structure shall <br /> ' be cut as necessary to fit the proposed pipe, any annular space between the structure and pipe shall <br /> be filled with a non-shrink grout. Larger voids shall be bricked and motored with a solid block. <br /> ' Basis of Payment: This work will be paid for at the contract unit price per EACH for <br /> CONNECTION TO EXISTING STRUCTURE which shall be payment in full for performing the <br /> work as described herein. <br /> SP-19 PLUG EXISTING STORM SEWER <br /> ' Description: This work will consist of providing all labor, equipment, tools, materials, <br /> transportation, services, and technical competence required to remove an existing inlet or catch <br /> basin as identified on the plans. The upstream and downstream ends on the lead shall be brick and <br /> ' motored with a non-shrink grout. Block shall be a solid block type and a minimum of two rows <br /> thick. Mechanical plugs will be allowed with the approval of the Engineer. <br /> Method of Measurement: This work will be paid for at the contract unit price per EACH for the <br /> plugging of both the upstream and downstream sewer lead location. <br /> ' Basis of Payment: This work will be paid for at the contract unit price per EACH for <br /> PLUG EXISTING STORM SEWER which shall be payment in full for performing the workas <br /> described herein. <br /> END OF SPECIAL PROVISIONS <br /> 10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.