My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2022-128 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Dunn Company, A Division of Tyrolt, Inc., for Annual Street Restoration Project, City Project 2022-08
COD
>
City Clerk
>
RESOLUTIONS
>
2022
>
R2022-128 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Dunn Company, A Division of Tyrolt, Inc., for Annual Street Restoration Project, City Project 2022-08
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2023 5:05:15 PM
Creation date
8/16/2022 4:27:07 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2022-128
Res Ord Title
R2022-128 Resolution Accepting the Bid and Authorizing the Execution of a Contract with Dunn Company, A Division of Tyrolt, Inc., for Annual Street Restoration Project, City Project 2022-08
Department
Public Works
Approved Date
8/15/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
177
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SPECIAL PROVISIONS <br /> SP-9 SCHEDULE OF WORK <br /> Description: The General Contractor and All Sub-Contractors shall furnish in writing, or <br /> electronic form, a weekly schedule by 12:00 P.M., Thursday, prior to the week being scheduled, so <br /> all media, safety services and other divisions can be notified. All work shall be approved by the <br /> Engineer. ' <br /> Basis of Payment: Cost of the work will not be paid for separately but shall be considered <br /> as included with the various work items involved. <br /> SP-10 SIDEWALKS, CURBS, AND CURB RAMPS <br /> Description: All sidewalks, and curb ramps must be replaced and open to pedestrian , <br /> traffic within 7 calendar days of removal. Any potential trip hazards greater than 1/4" cannot be left <br /> when opening the sidewalk. If needed, temporary ramp material may be used to fill in the gap left , <br /> prior to paving the road. All excavation necessary to set curb and sidewalk at the proper grades to <br /> achieve ADA compliance will be considered included in the corresponding work item. <br /> Basis of Payment: Sidewalk work will be considered included with applicable sidewalk ' <br /> pay items. If temporary ramp material is used, it will be paid for at the contract unit price per <br /> SQUARE YARD for TEMPORARY RAMP. <br /> SP-11 CLASS D PATCHES <br /> Description: The need for patches will be assessed before and after ' <br /> P <br /> milling operations. ' <br /> Basis of Payment: Patches on Jasper Street will be paid for at the contract unit price per <br /> SQUARE YARD for CLASS D PATCHES, of the type and depth specified. <br /> SP-12 UTILITIES TO BE A ' <br /> DJUSTED <br /> Description: This work will consist of adjusting manholes and valve boxes in accordance I <br /> with Sections 602 and 603 of the Standard Specifications and as modified herein. All utility <br /> adjustments excluding ones on streets receiving soil cement treatment (if any) will be completed <br /> after the paving work has been completed. <br /> Removal: The pavement shall be cut and removed to minimum distance of 12" from <br /> around the outside vertical edge of the casting in a circular fashion centered on the casting. The <br /> minimum depth of the concrete collar will be 12". Additional backfill if needed will be compacted <br /> r <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.