My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2022-129 Resolution to Appropriate Additional Motor Fuel Tax Funds for Restoration of Streets and Highways by the Municipality under the Illinois Highway Code, City Project 2022-08, Asphalt
COD
>
City Clerk
>
RESOLUTIONS
>
2022
>
R2022-129 Resolution to Appropriate Additional Motor Fuel Tax Funds for Restoration of Streets and Highways by the Municipality under the Illinois Highway Code, City Project 2022-08, Asphalt
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2023 5:05:15 PM
Creation date
8/17/2022 12:46:01 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2022-129
Res Ord Title
R2022-129 Resolution to Appropriate Additional Motor Fuel Tax Funds for Restoration of Streets and Highways by the Municipality under the Illinois Highway Code, City Project 2022-08, Asphalt
Department
Public Works
Approved Date
8/15/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Public Works <br /> DATE: 8/5/2022 <br /> MEMO: 202245 <br /> TO: Honorable Mayor Moore Wolfe and City Council <br /> FROM: Scot Wrighton,City Manager <br /> Matthew C. Newell,P.E.,Public Works Director <br /> SUBJECT: <br /> Resolution to Appropriate Additional Motor Fuel Tax Funds for Restoration of Streets and Highways by the <br /> Municipality under the Illinois Highway Code <br /> City Project 2022-08,Asphalt <br /> SUMMARY RECOMMENDATION: <br /> It is recommended that the City Council approve the attached Resolutions authorizing the Mayor to sign and the City Clerk to <br /> attest to the following: <br /> 1. Appropriating an additional$319,636 in State Motor Fuel Tax(MFT)funds to the$1,650,000 already appropriated to the project,for a <br /> total of$1,969,636 for the proposed 2022 Street Restoration project,City Project 2022-08,Asphalt;and <br /> 2. Awarding the contract for the Annual Street Restoration Project, City Project 2022-08,to Dunn Company,A Division <br /> of Tyrolt,Inc. as the lowest,responsible bidder in the amount of$2,935,000 and that the Mayor be authorized to execute <br /> the contract and the City Clerk to attest. The resolution represents an expenditure of$2,935,000 as the low bid plus <br /> $53,367.49 for project contingencies. The contract documents excluding project specific drawings,conditions,and <br /> provisions are attached. <br /> BACKGROUND: <br /> Streets Inspected Annually <br /> The Engineering Division inspects and rates approximately 1/2 of the City's streets on a yearly basis. The results of these <br /> inspections are input into a computer database which is used to project the future condition of the streets based on their current <br /> and historical condition,and surface type(i.e. brick,concrete,asphalt,etc.). This data is then paired with available funding and <br /> is used as a basis to aid City Engineering in the preparation of the City's yearly street improvement program. Staff then <br /> determines what type of improvement would be appropriate for each street. <br /> Project Description <br /> The 2022 project will perform mill and overlay work along Montgomery PI,an Alley East of Oakland and south of Eldorado,W. <br /> Leafland Ave.,E. Wood St. E Cantrell St. N Oakland Ave. Wildwood Dr,and E Pershing Rd(see attached location maps). <br /> These roads show signs of surface fatigue due to age. The surface needs to be replaced before defects further degrade the road's <br /> base. Pershing Rd was added due to a request from the Illinois Department of Transportation due to pavement damage from a <br /> large watermain failure last winter. <br /> Of particular note: E. Roosevelt Ave. is scheduled for a full reconstruction due to advanced deterioration. Chestnut Ave is <br /> scheduled to be widened due to the construction of Fire Station 7. In addition,pavement patching will be performed along <br /> portions of W. Rattan Ave. and N. Lourdes Ave. The tables below provide additional detail on the project. In total,5 lane miles <br /> of the City's 825 total lane miles will be rehabilitated as part of this project. <br />
The URL can be used to link to this page
Your browser does not support the video tag.