My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2022-163 Resolution Authozing Agreement with Ameren Illinois Company for Interconnection Solar
COD
>
City Clerk
>
RESOLUTIONS
>
2022
>
R2022-163 Resolution Authozing Agreement with Ameren Illinois Company for Interconnection Solar
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2023 5:05:19 PM
Creation date
10/7/2022 9:55:57 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2022-163
Res Ord Title
R2022-163 Resolution Authozing Agreement with Ameren Illinois Company for Interconnection Solar
Department
City Manager
Approved Date
10/3/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Interconnection study—Any of the following studies, as determined to be appropriate by the <br /> EDC: the interconnection feasibility study,the interconnection system impact study, and the <br /> interconnection facilities study. <br /> Illinois standard distributed generation interconnection rules—The most current version of <br /> the procedures for interconnecting distributed generation facilities adopted by the Illinois <br /> Commerce Commission. See 83 Ill. Adm. Code 466. <br /> Parallel operation or Parallel—The state of operation that occurs when a distributed generation <br /> facility is connected electrically to the electric distribution system. <br /> Point of interconnection—The point where the distributed generation facility is electrically <br /> connected to the electric distribution system. Point of interconnection has the same meaning as <br /> the term "point of common coupling" defined in 3.1.13 of IEEE Standard 1547. <br /> Witness test—For lab-certified equipment,verification(either by an on-site observation or <br /> review of documents) by the EDC that the interconnection installation evaluation required by <br /> IEEE Standard 1547 Section 5.3 and the commissioning test required by IEEE Standard 1547 <br /> Section 5.4 have been adequately performed. For interconnection equipment that has not been <br /> lab-certified, the witness test shall also include verification by the EDC of the on-site design tests <br /> required by IEEE Standard 1547 Section 5.1 and verification by the EDC of production tests <br /> required by IEEE Standard 1547 Section 5.2. All tests verified by the EDC are to be performed <br /> in accordance with the test procedures specified by IEEE Standard 1547.1. <br />
The URL can be used to link to this page
Your browser does not support the video tag.