Interconnection study—Any of the following studies, as determined to be appropriate by the <br /> EDC: the interconnection feasibility study,the interconnection system impact study, and the <br /> interconnection facilities study. <br /> Illinois standard distributed generation interconnection rules—The most current version of <br /> the procedures for interconnecting distributed generation facilities adopted by the Illinois <br /> Commerce Commission. See 83 Ill. Adm. Code 466. <br /> Parallel operation or Parallel—The state of operation that occurs when a distributed generation <br /> facility is connected electrically to the electric distribution system. <br /> Point of interconnection—The point where the distributed generation facility is electrically <br /> connected to the electric distribution system. Point of interconnection has the same meaning as <br /> the term "point of common coupling" defined in 3.1.13 of IEEE Standard 1547. <br /> Witness test—For lab-certified equipment,verification(either by an on-site observation or <br /> review of documents) by the EDC that the interconnection installation evaluation required by <br /> IEEE Standard 1547 Section 5.3 and the commissioning test required by IEEE Standard 1547 <br /> Section 5.4 have been adequately performed. For interconnection equipment that has not been <br /> lab-certified, the witness test shall also include verification by the EDC of the on-site design tests <br /> required by IEEE Standard 1547 Section 5.1 and verification by the EDC of production tests <br /> required by IEEE Standard 1547 Section 5.2. All tests verified by the EDC are to be performed <br /> in accordance with the test procedures specified by IEEE Standard 1547.1. <br />