My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2022-163 Resolution Authozing Agreement with Ameren Illinois Company for Interconnection Solar
COD
>
City Clerk
>
RESOLUTIONS
>
2022
>
R2022-163 Resolution Authozing Agreement with Ameren Illinois Company for Interconnection Solar
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2023 5:05:19 PM
Creation date
10/7/2022 9:55:57 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2022-163
Res Ord Title
R2022-163 Resolution Authozing Agreement with Ameren Illinois Company for Interconnection Solar
Department
City Manager
Approved Date
10/3/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment 3 <br /> Description, Costs and Time Required to Build and <br /> Install the EDC's Interconnection Facilities <br /> This attachment is to be completed by the EDC and shall include the following: <br /> 1. Required interconnection facilities, including any required metering. <br /> Per the prior studies -EDC shall build the substation facilities as required to support <br /> the interconnection of the interconnection customer proposed facility up to the point <br /> of disconnect. The interconnection would consist of installing primary metering, <br /> Viper at the substation and substation transformer lightning arrester upgrade. The <br /> interconnection customer would be responsible for construction to the point of <br /> disconnect. All costs shall be paid for and/or reimbursed by the interconnection <br /> customer pursuant to Article 5 of this agreement. The interconnection customer is <br /> required to construct all facilities which connect to EDC's facilities or otherwise <br /> interface with EDC's facilities,all as determined by EDC's final, detailed <br /> engineering, in accordance with EDC's published standards. <br /> Additional required interconnection facilities and system upgrades may be identified <br /> while completing Detailed Engineering. <br /> 2. An estimate of itemized costs charged by the EDC for interconnection, including <br /> overheads,based on results from prior studies. <br /> City of Decatur: 400 N Franklin St,Decatur, IL-780 KW(PowerClerk DER-09571) <br />
The URL can be used to link to this page
Your browser does not support the video tag.