Laserfiche WebLink
Attachment 5 <br /> Monitoring and Control Requirements <br /> This attachment is to be completed by the EDC and shall include the following: <br /> 1. The EDC's monitoring and control requirements must be specified, along with a reference <br /> to the EDC's written requirements documents from which these requirements are derived. <br /> 2. An internet link to the requirements documents. <br /> htti)s://www.ameren.com/service-manual <br /> http:Hstandards.ieee.org <br /> Attachment 6 <br /> Metering Requirements <br /> This attachment is to be completed by the EDC and shall include the following: <br /> 1. The metering requirements for the distributed generation facility. <br /> The specific metering requirements and equipment will be specified as part of the <br /> Detailed Engineering. <br /> 2. Identification of the appropriate tariffs that establish these requirements. <br /> 3. An internet link to these tariffs. <br /> https://www.ameren.com/illinois/business/rates/ <br /> https://www.ameren.com/illinois/electric-choice/renewables <br />