Laserfiche WebLink
Exhibit B <br /> Attachment 2 <br /> Construction Schedule,Proposed Equipment& Settings <br /> This attachment is to be completed by the interconnection customer and shall include the <br /> following: <br /> 1. The construction schedule for the distributed generation facility. <br /> 2. A one-line diagram indicating the distributed generation facility, interconnection <br /> equipment,interconnection facilities,metering equipment,and distribution upgrades. <br /> 3. Component specifications for equipment identified in the one-line diagram. <br /> 4. Component settings. <br /> 5. Proposed sequence of operations. <br /> 6. A three line diagram showing current potential circuits for protective relays. <br /> 7. Relay tripping and control schematic diagram. <br />