Exhibit B <br /> An estimate of itemized costs charged by the EDC for interconnection,including <br /> overheads. <br /> Nip I <br /> $281,400.00 for installing primary metering,Viper at the substation and substation <br /> transformer lightning arrester upgrade. This will be subject to a true-up process at the <br /> end of the project. <br /> Ameren Illinois reserves the right to revise this estimate prior to and during construction based on the <br /> requirements of Good Utility practices not foreseen at the time of the original estimate. The revisions <br /> to the estimate may include,including but are not limited to,changes in the cost of materials,required <br /> labor,and the awarding of REC s to the developer. <br /> 3. An estimate for the time required to build and install the EDC's interconnection facilities <br /> based on results from prior studies and an estimate of the date upon which the facilities <br /> will be completed. <br /> Attachment 4 <br /> Operating Requirements for Distributed Generation Facilities Operating in Parallel <br /> The EDC shall list specific operating practices that apply to this distributed generation <br /> interconnection and the conditions under which each listed specific operating practice applies. <br />