My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2022-163 Resolution Authozing Agreement with Ameren Illinois Company for Interconnection Solar
COD
>
City Clerk
>
RESOLUTIONS
>
2022
>
R2022-163 Resolution Authozing Agreement with Ameren Illinois Company for Interconnection Solar
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/24/2023 5:05:19 PM
Creation date
10/7/2022 9:55:57 AM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2022-163
Res Ord Title
R2022-163 Resolution Authozing Agreement with Ameren Illinois Company for Interconnection Solar
Department
City Manager
Approved Date
10/3/2022
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
41
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit B <br /> An estimate of itemized costs charged by the EDC for interconnection,including <br /> overheads. <br /> Nip I <br /> $281,400.00 for installing primary metering,Viper at the substation and substation <br /> transformer lightning arrester upgrade. This will be subject to a true-up process at the <br /> end of the project. <br /> Ameren Illinois reserves the right to revise this estimate prior to and during construction based on the <br /> requirements of Good Utility practices not foreseen at the time of the original estimate. The revisions <br /> to the estimate may include,including but are not limited to,changes in the cost of materials,required <br /> labor,and the awarding of REC s to the developer. <br /> 3. An estimate for the time required to build and install the EDC's interconnection facilities <br /> based on results from prior studies and an estimate of the date upon which the facilities <br /> will be completed. <br /> Attachment 4 <br /> Operating Requirements for Distributed Generation Facilities Operating in Parallel <br /> The EDC shall list specific operating practices that apply to this distributed generation <br /> interconnection and the conditions under which each listed specific operating practice applies. <br />
The URL can be used to link to this page
Your browser does not support the video tag.