AECOM will attend the pre-bid meeting and assist the City in presenting the <br /> prospective bidders with an overview of the project scope, review of the <br /> instructions to bidders, and the general conditions of the construction contract. <br /> AECOM will respond to inquiries and questions from contractors, manufacturers, <br /> and other interested parties. The fee estimate is based on receiving 50 <br /> questions during the bidding period with additional hours to distribute and track <br /> the responses. Questions and responses will be documented, filed, and <br /> transmitted to the City as requested. AECOM will prepare two addenda to clarify <br /> requirements of the contract and will distribute the Addenda to all parties that <br /> obtained bidding documents. <br /> AECOM will review the contractor's bids submitted for general conformance and <br /> the ability to conduct the work. AECOM will prepare a bid tabulation summarizing <br /> each contractor's bid. Tabulations will be broken down into the major <br /> components that were identified in the contract documents. After analyzing the <br /> bids received, AECOM will prepare a recommendation to the City for the award <br /> of a contract. <br /> Activities <br /> A-6.1 Prepare invitation to bid. <br /> A-6.2 Provide bid documents to interested contractors and suppliers. <br /> A-6.3 Attend pre-bid meeting <br /> A-6.4 Document bidder questions and responses <br /> A-6.5 Prepare bid tabulations <br /> A-6.6 Prepare letter of award recommendation <br /> Product: <br /> P-6.1 Bid documents <br /> P-6.2 Pre-Bid Meeting Minutes <br /> P-6.3 Bid tabulation <br /> P-6.4 Letter of award recommendation <br /> DESIGN SCHEDULE <br /> The proposed schedule for design services generally follows the dates below. It is anticipated <br /> that a set of documents for SRF application will be available along with the 90% design. 100% <br /> documents for bidding will then be delivered in time to allow for procurement of construction <br /> services prior to SRF funding. <br /> Anticipated Notice to Proceed: 11/1/22 <br /> Conceptual Design Report to Client 1/31/23 <br /> 30% Design to Client 4/25/23 <br /> 90% Design to Client 8/15/23 <br /> 100% Design to Client 9/26/23 <br /> COMPENSATION <br /> AECOM proposes a fee of eight hundred twenty nine thousand and six hundred dollars <br /> ($829,600) to perform the engineering design services for the City of Decatur Basin 5 and 6 <br /> 5 of 8 <br />