My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2023-34 Resolution Authorizing an Agreement with the State of Illinois for Improvements to IL 121 (Mt.Zion Road) from its Intersection with US 36 to the Edge of City Limits, City Project 2022-15, Section No. 22-00215-00-TL
COD
>
City Clerk
>
RESOLUTIONS
>
2023
>
R2023-34 Resolution Authorizing an Agreement with the State of Illinois for Improvements to IL 121 (Mt.Zion Road) from its Intersection with US 36 to the Edge of City Limits, City Project 2022-15, Section No. 22-00215-00-TL
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/28/2023 4:26:02 PM
Creation date
2/28/2023 4:15:52 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2023-34
Res Ord Title
R2023-34 Resolution Authorizing an Agreement with the State of Illinois for Improvements to IL 121 (Mt.Zion Road) from its Intersection with US 36 to the Edge of City Limits, City Project 2022-15, Section No. 22-00215-00-TL
Department
Public Works
Approved Date
2/21/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit 1 <br /> FAP 320 (IL 121) <br /> Section: 101 RS-2 <br /> CITY Section: 22-00215-00-TL <br /> Macon County <br /> Job No.: C-97-004-16 <br /> Agreement No.: JN 722 003 <br /> Contract No.: 74739 <br /> AGREEMENT <br /> This agreement entered into this day of A.D., 2023, by and between <br /> the STATE OF ILLINOIS, acting by and through its DEPARTMENT OF TRANSPORTATION <br /> hereinafter called the STATE, and the CITY OF DECATUR, in the State of Illinois, hereinafter <br /> called the CITY. <br /> WITNESSETH: <br /> WHEREAS, the STATE, in order to facilitate the free flow of traffic and ensure safety to <br /> the motoring public, is desirous of improving approximately 21,722 feet (4.1 miles) of FAP 320 <br /> IL 121), State Section 101 RS-2, CITY Section 22-00215-00-TL from the south Village limits of Mt. <br /> Zion north to its intersection with U.S. 36 in Decatur, by milling and resurfacing, patching, repairing <br /> curb, gutter and medians, constructing Americans with Disabilities Act (ADA) compliant curb <br /> ramps, modernizing or replacing existing traffic signal systems and by performing all other work <br /> necessary to complete the section in accordance with the approved plans and specifications; and <br /> WHEREAS, the improvements to FAP 320 (IL 121) shall consist of: <br /> 1. 2,850 FEET SOUTHEAST OF MAIN STREET IN MT. ZION TO 450 FEET SOUTH OF LOST <br /> BRIDGE ROAD: This portion of the project is not within the CITY limits of DECATUR and are <br /> not discussed in this agreement. <br /> 2. 450 FEET SOUTH OF LOST BRIDGE ROAD TO EVERGREEN COURT: Mill and resurface <br /> the existing 62-foot edge-to-edge pavement width, providing for two 12-foot wide through <br /> traffic lanes in each direction and a 14-foot wide two-way left-turn lane and retaining the <br /> existing combination concrete curb and gutter; mill and resurface the existing 12-foot and <br /> variable width northbound right turn lane between Fitzgerald Road and Southgate Drive; <br /> improve existing traffic signals and attached highway lighting at the intersections of FAP 320 <br /> (IL 121) with Lost Bridge Road and Southgate Drive. <br />
The URL can be used to link to this page
Your browser does not support the video tag.