Laserfiche WebLink
STAFF RESUMES <br /> Taylor Cox <br /> Senior Planner <br /> tee , . <br /> Mr.Cox is a highly experienced project planner specializing in transportation,transit and <br /> ADA. His key skills include transit and transportation planning,bus and rail service and <br /> operations planning,transit needs assessments,ADA transition plans,Section 4(f)/6(f) <br /> and joint land use. He has experience working on all facets of transit and transportation Education <br /> planning, including route network modeling,short-range and long-range planning and public MS, Regional and Community <br /> outreach. He also has experience using ArcGIS software and is trained in using AutoCad, Planning, Kansas State University <br /> CommunityVIZ,On The Map and TBEST. <br /> Sarasota County Area Transit-SCAT Fixed-Route Service Optimization Study-Sarasota Years of Experience: 9 <br /> County,FL Professional Affiliations <br /> Project Planner:This project included the redesign and optimization of SCAT's fixed route American Planning Association <br /> network.The team identified and designed mobility on demand(MOD)service areas and <br /> services to serve ADA and general public demand in areas with low density of demand International Code Council <br /> and poor fixed route performance.Service schedules and run cuts also were prepared. <br /> Expected to yield$600k in net operating cost savings,a MaaS provider was selected and <br /> the redesigned transit network and new MOD services were launched June 2021. Since, STAFFING AVAILABILITY <br /> ridership on the new MOD service exceeds 20,000 per month,has created a shift by ADA <br /> passengers to MOD and increased fixed route ridership. Availability ' -' <br /> Project: to <br /> Current <br /> Transit Authority of Northern Kentucky(TANK)-System Redesign Study-Fort Wright,KY <br /> Project Planner:This project involved strategic planning support to assess services, •.Availability Dedicated to City <br /> operating conditions and demand,as well as develop service concepts for improving of Decatur: •'. <br /> mobility.The assessment of mobility needs considered the rapidly-growing employment <br /> and logistical services around the airport. It also reviewed obstacles posed by limited Remaining .• Availability <br /> river crossings and limitations of the roadway network that make it difficult to connect _ Needed: <br /> communities and serve high demand for travel between Northern Kentucky and Cincinnati <br /> (OH).The effort ultimately resulted in a phased redesign of the fixed-route network with a *Availability of key staff is estimated <br /> corresponding implementation plan for potential future service enhancements as resources based on expected effort over next <br /> become available. three months associated with current <br /> project workload. Thereafter,availability <br /> Hillsborough Transit Authority(HART)-Tampa Arterial Bus Rapid Transit Study-Tampa,FL will begin to increase significantly as <br /> Project Planner:This ongoing project is identifying the most appropriate corridor to connect projects end. <br /> Downtown Tampa to the University of South Florida Tampa campus with premium BRT <br /> service using a combination of three key state roads. In addition to designing the low-cost <br /> and build-alternative BRT options,the team also is developing related concepts to assist <br /> HART with improving local pedestrian,bicycle and bus support infrastructure along the key <br /> corridors and on intersecting streets between the two major activity centers. <br /> Owensboro Transit System(OTS)-Transit Network Study-Owensboro,KY <br /> Project Planner:The study,which involved extensive public,rider and stakeholder outreach, <br /> evaluated transit service performance and developed a 10-year vision roadmap to guide and <br /> prioritize transit service and capital investments for OTS over the next decade.The existing <br /> services evaluation led to recommendations for network redesign to improve operational <br /> efficiency and help reallocate resources to enhance service levels and service quality to <br /> benefit riders.The study also assessed current OTS facilities and provided recommendations <br /> for locating a new downtown transfer center.The cost-neutral network improvements were <br /> adopted by the City. <br /> Midland/Odessa Urban Transit District-Comprehensive Operations Analysis-Midland,TX <br /> Project Planner:This project primarily involved the strategic redesign of the transit networks <br /> in the neighboring cities of Midland and Odessa.The effort evaluated existing services and <br /> service area conditions,as well as included public outreach.The analyses resulted in the <br /> development of three alternative concepts that ultimately led to the preparation of a phasing <br /> and financial plan that recommended modified networks in each city. <br /> AMNIL <br /> be n e s e h Decatur Public Transit Systerr//Technical Comprehensive Operational Analysis Fixed Route Services 6 <br />