Laserfiche WebLink
-2- <br /> The MSC roof is original to the structure and was coated with a water proofing material in 2002. <br /> The roof is now in need of major improvements which could entail a new coating or full <br /> replacement. As part of these professional services, AEX will recommend and design a roof <br /> improvement. In the future(not part of this project), it is recommended that solar panels be <br /> added, and other roofing improvements be made to better protect city vehicles and equipment. <br /> The MSC has two main entryways, one for the Municipal Services Division and the other for the <br /> Water Services Division. Staff members must go through the men's and women's restrooms to <br /> move between the main office areas. The 2017 AEX facility study recommended that this <br /> internal circulation be improved. The proposed professional services include design of an <br /> addition to the front of the building to create a more direct access between the two major office <br /> areas. <br /> Decatur Public Library Improvements—The City needs to upgrade the Library Buildings <br /> HVAC system, recoat the roof, and make other site upgrades. The City Council authorized these <br /> improvements in the 2023 budget. As part of this work, it is proposed that AEX perform the <br /> following services: <br /> • Provide design services to re-roof the building. <br /> • Provide design services to repair the masonry planter walls around the perimeter of the <br /> building. <br /> • Provide contracting assistance to replace or upgrade the building's main chiller. <br /> Decatur Civic Center Improvements within City utilized space—As discussed in previous <br /> meetings, the City would like to upgrade security screening at the City offices in the Civic <br /> Center, while simultaneously anticipating facility improvements recommended by the H&LA <br /> "highest and best uses"report for the Civic Center. The City Council allocated$200,000 in the <br /> 2023 budget for Civic Center facilities planning and security enhancements. Staff recommends <br /> that the first phase of this project consist of designing spaces for additional meeting rooms and <br /> other recommendations from the H&LA report; "hardening"existing entrances, tightening <br /> procedures for access points and meeting venues, and mitigating security other vulnerabilities. <br /> To move offices around, we need to conduct a comprehensive space analysis of all City of <br /> Decatur uses of the Civic Center. It is proposed that AEX perform the following services to get <br /> the city started on these phase one tasks: <br /> • Provide space analysis of the building. <br /> • Provide a security assessment and recommendation to reduce our vulnerabilities. <br /> • Oversee the access "hardening"upgrades coming from the security assessment. <br /> Other than security improvements, no remodeling is anticipated in 2023 (this would be phase <br /> two work) <br /> POTENTIAL OBJECTION: None foreseen. Staff will coordinate with library and Civic <br /> Center leadership. <br />