§4.2.3 The Ar-ohiteet shall,as an Additional SeFviee,pr-evide sen,iees made neoessaf-y by a Gontmeter-'s proposed
<br /> ehange in the Work.The Arehiteet shall I-,-,-—.,.eits te the Ar-ehiteet's instFameHts of 9 efviee necessitated by
<br /> Change fa Gensti 'i rw b Pir-eetives as an n aa•* t e
<br /> §4.2.4 if the ser-viees eever-ed by this Agfeement have fiet been eaRipleted within Rienths of the date ef this
<br /> AgFeement,through tie fault of the Arehiteet,extension of the Ar-ehiteet's seFviees beyond tha4 time shall be
<br /> ated a n dditi,tial S
<br /> ....ii;t.:„�...,.......�..uu.ccvrmrei-v-cccu-:
<br /> ARTICLE 5 OWNER'S RESPONSIBILITIES
<br /> §5.1 Unless otherwise provided for under this Agreement,the Owner shall provide information in a timely manner
<br /> regarding requirements for and limitations on the Project,including a written program which shall set forth the
<br /> Owner's objectives,schedule,constraints and criteria,including space requirements and relationships,flexibility,
<br /> expandability,special equipment,systems and site requirements.
<br /> §5.2 The Owner shall establish the Owner's budget for the Project,including(1)the budget for the Cost of the Work
<br /> as defined in Section 6.1;(2)the Owner's other costs;and,(3)reasonable contingencies related to all of these costs.
<br /> The Owner shall update the Owner's budget for the Project as necessary throughout the duration of the Project until
<br /> final completion.If the Owner significantly increases or decreases the Owner's budget for the Cost of the Work,the
<br /> Owner shall notify the Architect.The Owner and the Architect shall thereafter agree to a corresponding change in
<br /> the Project's scope and quality.
<br /> §5.3 The Owner shall furnish surveys to describe physical characteristics,legal limitations and utility locations for
<br /> the site of the Project;a written legal description of the site;and services of geotechnical engineers or other
<br /> consultants,when the Architect requests such services and demonstrates that they are reasonably required by the
<br /> scope of the Project.
<br /> §5.4 The Owner shall coordinate the services of its own consultants with those services provided by the Architect.
<br /> Upon the Architect's request,the Owner shall furnish copies of the scope of services in the contracts between the
<br /> Owner and the Owner's consultants.The Owner shall require that its consultants and contractors maintain insurance,
<br /> including professional liability insurance,as appropriate to the services or work provided.
<br /> §5.5 The Owner shall furnish tests,inspections and reports required by law or the Contract Documents,such as
<br /> structural,mechanical,and chemical tests;tests for air and water pollution;and tests for hazardous materials.
<br /> §5.6 The Owner shall furnish all legal,insurance and accounting services,including auditing services,that may be
<br /> reasonably necessary at any time for the Project to meet the Owner's needs and interests.
<br /> §5.7 The Owner shall provide prompt written notice to the Architect if the Owner becomes aware of any fault or
<br /> defect in the Project,including errors,omissions or inconsistencies in the Architect's Instruments of Service.
<br /> §5.8 The Owner shall endeavor to communicate with the Contractor through the Architect about matters arising out
<br /> of or relating to the Contract Documents.
<br /> §5.9 The Owner shall provide the Architect access to the Project site prior to commencement of the Work and shall
<br /> obligate the Contractor to provide the Architect access to the Work wherever it is in preparation or progress.
<br /> §5.10 Within 15 days after receipt of a written request from the Architect,the Owner shall furnish the requested
<br /> information as necessary and relevant for the Architect to evaluate,give notice of,or enforce lien rights.
<br /> ARTICLE 6 COST OF THE WORK
<br /> §6.1 For purposes of this Agreement,the Cost of the Work shall be the total cost to the Owner to construct all
<br /> elements of the Project designed or specified by the Architect and shall include contractors' general conditions costs,
<br /> overhead and profit.The Cost of the Work also includes the reasonable value of labor,materials,and equipment,
<br /> donated to,or otherwise furnished by,the Owner.The Cost of the Work does not include the compensation of the
<br /> Architect;the costs of the land,rights-of-way,financing,or contingencies for changes in the Work;or other costs
<br /> that are the responsibility of the Owner.
<br /> Init. AIA Document 8104–2017.Copyright©1974,1978,1987,1997,2007 and 2017.All rights reserved."The American Institute of Architects,""American Institute
<br /> of Architects,""AIA,"the AIA Logo,and"AIA Contract Documents"are trademarks of The American Institute of Architects.This document was produced at 7
<br /> 21:25:21 CT on 03/29/2023 under Order No.4104236690 which expires on 09/30/2023,is not for resale,is licensed for one-time use only,and may only be used
<br /> in accordance with the AIA Contract Documents®Terms of Service.To report copyright violations,e-mail docinfo@aiacontracts.com.
<br /> User Notes: (369ADA3C)
<br />
|