My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
R2023-59 Resolution Authorizing an Agreement with Architectural Expressions, LLP, for Decatur Public Library Improvements
COD
>
City Clerk
>
RESOLUTIONS
>
2023
>
R2023-59 Resolution Authorizing an Agreement with Architectural Expressions, LLP, for Decatur Public Library Improvements
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2023 12:33:47 PM
Creation date
4/4/2023 12:32:42 PM
Metadata
Fields
Template:
Resolution/Ordinance
Res Ord Num
R2023-59
Res Ord Title
R2023-59 Resolution Authorizing an Agreement with Architectural Expressions, LLP, for Decatur Public Library Improvements
Department
City Manager
Approved Date
4/3/2023
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
§6.2 The Owner's budget for the Cost of the Work is provided in Initial Information,and shall be adjusted <br /> throughout the Project as required under Sections 5.2,6.4 and 6.5.Evaluations of the Owner's budget for the Cost of <br /> the Work,and the preliminary estimate of the Cost of the Work and updated estimates of the Cost of the Work <br /> prepared by the Architect,represent the Architect's judgment as a design professional.It is recognized,however, <br /> that neither the Architect nor the Owner has control over the cost of labor,materials or equipment;the Contractor's <br /> methods of determining bid prices;or competitive bidding,market or negotiating conditions.Accordingly,the <br /> Architect cannot and does not warrant or represent that bids or negotiated prices will not vary from the Owner's <br /> budget for the Cost of the Work,or from any estimate of the Cost of the Work,or evaluation,prepared or agreed to <br /> by the Architect. <br /> §6.3 In preparing estimates of the Cost of Work,the Architect shall be permitted to include contingencies for design, <br /> bidding and price escalation;to determine what materials,equipment,component systems and types of construction <br /> are to be included in the Contract Documents;to recommend reasonable adjustments in the program and scope of <br /> the Project;and to include design alternates as may be necessary to adjust the estimated Cost of the Work to meet <br /> the Owner's budget.The Architect's estimate of the Cost of the Work shall be based on current area,volume or <br /> similar conceptual estimating techniques.If the Owner requires a detailed estimate of the Cost of the Work,the <br /> Architect shall provide such an estimate,if identified as the Architect's responsibility in Section 4.1,as a <br /> Supplemental Service. <br /> §6.4 If,through no fault of the Architect,construction procurement activities have not commenced within 90 days <br /> after the Architect submits the Construction Documents to the Owner the Owner's budget for the Cost of the Work <br /> shall be adjusted to reflect changes in the general level of prices in the applicable construction market. <br /> §6.5 If at any time the Architect's estimate of the Cost of the Work exceeds the Owner's budget for the Cost of the <br /> Work,the Architect shall make appropriate recommendations to the Owner to adjust the Project's size,quality or <br /> budget for the Cost of the Work,and the Owner shall cooperate with the Architect in making such adjustments. <br /> §6.6 If the Owner's current budget for the Cost of the Work at the conclusion of the Construction Documents Phase <br /> Services is exceeded by the lowest bona fide bid or negotiated proposal,the Owner shall <br /> .1 give written approval of an increase in the budget for the Cost of the Work; <br /> .2 authorize rebidding or renegotiating of the Project within a reasonable time; <br /> .3 terminate in accordance with Section 9.5; <br /> .4 in consultation with the Architect,revise the Project program,scope,or quality as required to reduce <br /> the Cost of the Work;or <br /> .5 implement any other mutually acceptable alternative. <br /> §6.7 If the Owner chooses to proceed under Section 6.6.4,the Architect shall modify the Construction Documents as <br /> necessary to comply with the Owner's budget for the Cost of the Work at the conclusion of the Construction <br /> Documents Phase Services,or the budget as adjusted under Section 6.6.1.If the Owner requires the Architect to <br /> modify the Construction Documents because the lowest bona fide bid or negotiated proposal exceeds the Owner's <br /> budget for the Cost of the Work due to market conditions the Architect could not reasonably anticipate,the Owner <br /> shall compensate the Architect for the modifications as an Additional Service pursuant to Section 11.3;otherwise <br /> the Architect's services shall be without additional compensation. In any event,the Architect's modification of the <br /> Construction Documents shall be the limit of the Architect's responsibility under this Article 6. <br /> ARTICLE 7 COPYRIGHTS AND LICENSES <br /> tr'lnsmitsiieh _f --- fi - f its the P <br /> J <br /> rights,other-Feserwed <br /> .ffind the e <br /> Init. AIA Document 8104—2017.Copyright©1974,1978,1987,1997,2007 and 2017.All rights reserved.'The American Institute of Architects,""American Institute <br /> of Architects,""AIA,"the AIA Logo,and"AIA Contract Documents"are trademarks of The American Institute of Architects.This document was produced at 8 <br /> 21:25:21 CT on 03/29/2023 under Order No.4104236690 which expires on 09/30/2023,is not for resale,is licensed for one-time use only,and may only be used <br /> in accordance with the AIA Contract Documents®Terms of Service.To report copyright violations,e-mail docinfo@aiacontracts.com. <br /> User Notes: (3B9ADA3C) <br />
The URL can be used to link to this page
Your browser does not support the video tag.