Laserfiche WebLink
O <br /> 11 <br /> CONCENTRIC <br /> INTEGRATION <br /> b. Tentative Specification List <br /> i. General Automation Specifications for installation of control panels. <br /> ii. SCADA Specification with Scope and input/output (10) list for Integration of the work <br /> described above. <br /> 5. OPINION OF PROBABLE COST- Prepare a detailed engineer's opinion of probable construction <br /> cost of the project. <br /> 6. REVIEW AND APPROVAL - Submit all bid documents to CMT for review and approval prior to <br /> distribution. <br /> Fee <br /> Our fee for the above scope will be computed on the basis of hourly billing rates for actual work time <br /> performed plus reimbursement of out-of-pocket expenses including travel costs, which total amount will <br /> not exceed $120,000. <br /> Concentric Assumptions / Customer Responsibilities <br /> 1. Customer will assign an initial project manager at the project kickoff meeting. <br /> 2. Customer will provide front-end documents and conduct all advertisement and bidding services. <br /> 3. Chemical systems controls and HVAC controls will remain as is and only require new connections <br /> for monitoring as in the existing SCADA system. <br /> 4. Existing instrumentation in the water treatment processes will not be replaced as part of this <br /> project. <br /> 5. Equipment naming and tagging convention will be discussed at the Kick-off meeting and will be <br /> defined after the 30% Design Submittal after a consensus is reached by the Project team. <br /> Project Schedule <br /> Project schedule will be coordinated with CMT Engineers' design schedule for advertising the project. <br /> PADECAC\2325228-Elect Improv Design\_Promo\2325288.00_DECAC_SWTP_EA_Proposal.docx <br /> Project#2325228.00 Page No. 3 <br />